MASBESTOS BUILDING INSPECTOR
INITIAL QUESTIONS WITH COMPLETE
SOLUTION

AHERA - The Asbestos Hazard Emergency Response Act. 40 CFR Part 763, Subpart E. Started 1986 and
requires that all schools, grades K-12 (non-profit), be inspected for the presence of ACBM (asbestos-
containing building material).

ACBM - Asbestos Containing Building Material

ASHARA - The Asbestos School Hazard Abatement Reauthorization Act. Started 1990, effective Nov.
1992, requires that an accredited Building Inspector perform any asbestos inspection conducted in a
public or commercial building. Extended the training requirement to cover asbestos workers,
supervisors, and inspectors in public and commercial buildings. ("Under the ASHARA revisions AHERA's
training requirements now apply to all persons working with asbestos in public and commercial
buildings...")

Increased number of hours required for asbestos worker and supervisor training to 32 and 40 hrs
respectively.

Building Inspector Responsibilities (AHERA & ASHARA) - 1. Determining whether ACBM is present in a
building

2. Assessing the physical characteristics of the ACBM within the building.

A building inspection involves: - 1. Investigation of records for the identification of ACBM

2. A physical and visual inspection of the building for suspect materials

3. Sampling and analyzing suspect materials to test for asbestos

4. Assessing the condition and location of the ACBM and other characteristics of the building

Management Planner Role - Uses info from the building inspection to estimate the degree of current or
potential hazard posed by the ACM and develop a plan for managing the ACM. After ACM is confirmed,
create O&M plan, stays in effect until ACM is removed.

OSHA - Occupational Safety and Health Administration - Protects workers

How AHERA affects your work/changed things: - 1. Defines ACM as being more than 1%.

2. Lays out 5 control methods: operations and maintenance, enclosure, encapsulation, repair, and
removal.

3. Describes clearance air sampling at end of job with aggressive air sampling and a TEM.

, 4. Regulates training classes like this one and requires this training for all workers working with asbestos
(excludes single-family homes)

What are the 5 control methods for asbestos, and what laid them out? - O&M, enclosure, encapsulation,
repair, and removal. AHERA created.

TEM - Transmission Electron Microscope/Microscopy. May be used to detect smaller fibers of asbestos.

ASHAA - Asbestos School Hazard Abatement Act. 1984, Directed EPA to help schools carry out their
asbestos hazard responsibilities.

MAP - Model Accreditation Plan. From EPA, said now everyone doing things with asbestos must adhere,
not just schools.

Public and commercial buildings: - All buildings other than school buildings and apartment buildings with
greater than 10 units.

NESHAP - National Emissions Standard for Hazardous Air Pollutants. 40 CFR Part 61, Subpart M

How NESHAP affects your work/changes things: - 1. Defines any job at least 160 sqft (100 in SoCal under
SCAQMD), 260 lf, or 35 cf as a large job

2. Asbestos must be wet before taken down and sealed in airtight container

3. Employer must notify EPA of the job 10 working days before begins (notify even if no asbestos for a
demo)

4. Waste bags must be labeled with the location of the job and name of waste generator, be 6 mil thick,
say "Danger

contains asbestos fibers

avoid creating dust

cancer and lung disease hazard"

4. Buildings musts be inspected for asbestos prior to demo or reno.

5. Requires there be no visible emissions to the outside air during removal

Buildings covered under NESHAP (and exclusions) - Excluded: private homes and apartment buildings
with 4 or less units (Except these are covered still in SoCal under SCAQMD)

Included: Institutional Buildings (hospitals, schools), commercial buildings (offices, apartment buildings),
industrial buildings (warehouses, factories).

Removal before reno or demo rule & exceptions - All RACM must be removed before demo or reno of a
building if the amount of ACM is greater than 160 sqft, 260 lf, or 35 cf

Exception: Does not need to be removed if it's Cat I nonfriable ACM (packing, gaskets, asphalt roofing,
vinyl - have flexibility and won't become DUST if hit), on a component packed in concrete, not accessible
for testing, not discovered before demo, or Cat II nonfriable (that are unlikely to become crumbled, or
reduced to powder during demo).

Información del documento

Subido en
11 de septiembre de 2024
Número de páginas
6
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$10.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
edunurse
3.6
(19)
Vendido
154
Seguidores
13
Artículos
6803
Última venta
3 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes