Examen

Exam (elaborations) ECCC

Document preview thumbnail
Vista previa 2 fuera de 12 páginas

USACE Response Options️️Forward Engineer Support Team-Advance (FEST-A) or Reconnaissance Team (RT) Advanced Echelon (ADVON) team Contingency Engineer District (CED) Reconnaissance Tasks️️Technical Reconnaissance (**General Engineers) Infrastructure Survey Environment Assessment Airfield Assessment Route Classification Tactical Reconnaissance (**Combat Engineers) Bridge Reconnaissance Route Reconnaissance Obstacle Reconnaissance Reconnaissance vs. Classification️️Classification is done by General Engineers Reconnaissance is done by Combat Engineers SWEAT-MSO️️Sewage Water Electricity Academics Trash Medical Safety Other Considerations MDMP and Construction Planning️️MDMP nests within construction planning and EN requirements for sustainment Project Origin/Routing️️Unit requests on a DA4283 Go to DPW for approval Create list for troop construction requests S3 syncs with DPW for project Projects are picked and project packet are given; scope of work, site plan, and drawings S3C produces construction directive, BOM, and Construct Activities Project assigned to executing company Definable Features of Work️️project supervisor identifies features of work during estimating and scheduling process. "Task which is sperate and distinct from other tasks, has separate control requirements, and may be identified by different trades or disciplines, or it may be work by the same trade in a different environment" For each definable feature of work️️Prep Phase: apply network analysis, scheduling, estimating Initial Phase: Choosing configuration, materials, equipment Follow Up Phase: adherence to standard procedures Completion Phase: (in doctrine - rework phase) Quality Management (QM)️️consists of Quality Assurance and Quality Control activities instituted to achieve the quality levels established by project plans and specifications or as directed quality established by the contract requirements Quality Control (QC)️️engineering unit's system in place during execution to manage, control, and document the unit's activities in compliance with the project plans and specifications requirements Unit QC Plan️️unit QC manager

Vista previa del contenido

ECCC GE Exam with comprehensive questions and answers
2024/2025


USACE Response Options✔️✔️Forward Engineer Support Team-Advance (FEST-A) or
Reconnaissance Team (RT)
Advanced Echelon (ADVON) team
Contingency Engineer District (CED)


Reconnaissance Tasks✔️✔️Technical Reconnaissance (**General Engineers)
Infrastructure Survey
Environment Assessment
Airfield Assessment
Route Classification
Tactical Reconnaissance (**Combat Engineers)
Bridge Reconnaissance
Route Reconnaissance
Obstacle Reconnaissance


Reconnaissance vs. Classification✔️✔️Classification is done by General Engineers
Reconnaissance is done by Combat Engineers


SWEAT-MSO✔️✔️Sewage
Water
Electricity
Academics
Trash
Medical
Safety

, Other Considerations


MDMP and Construction Planning✔️✔️MDMP nests within construction planning and EN
requirements for sustainment


Project Origin/Routing✔️✔️Unit requests on a DA4283
Go to DPW for approval
Create list for troop construction requests
S3 syncs with DPW for project
Projects are picked and project packet are given; scope of work, site plan, and drawings
S3C produces construction directive, BOM, and Construct Activities
Project assigned to executing company


Definable Features of Work✔️✔️project supervisor identifies features of work during estimating
and scheduling process. "Task which is sperate and distinct from other tasks, has separate control
requirements, and may be identified by different trades or disciplines, or it may be work by the
same trade in a different environment"


For each definable feature of work✔️✔️Prep Phase: apply network analysis, scheduling,
estimating
Initial Phase: Choosing configuration, materials, equipment
Follow Up Phase: adherence to standard procedures
Completion Phase: (in doctrine - rework phase)


Quality Management (QM)✔️✔️consists of Quality Assurance and Quality Control activities
instituted to achieve the quality levels established by project plans and specifications or as
directed quality established by the contract requirements


Quality Control (QC)✔️✔️engineering unit's system in place during execution to manage, control,
and document the unit's activities in compliance with the project plans and specifications
requirements

Información del documento

Subido en
11 de septiembre de 2024
Número de páginas
12
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$10.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
1
Seguidores
0
Artículos
1124
Última venta
-



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes