ICC Permit Technician Practice Exam Questions With
Complete Solutions
Corrosion Specialist - ANSWER designs and certifies cathodic protection system
Secondary containment shall be constructed to contain at least the following
volumes: - ANSWER A. 100% of usable capacity of primary where there is only one
primary is within the secondary
B. 150% of the largest container if there are multiple primary containers in a single
secondary
Cathodic protection tester will test cathodic protection system within __ months of
installation and every __ years thereafter - ANSWER 6 months
3 years
Spill container shall meet the following requirements: - ANSWER A. If made of
metal, exterior wall shall be protected from galvanic corrosion
B. Shall have minimum capacity of 5 gallons (19 L)
C. Shall have drain valve which allows drainage of the collected spill into the primary
container or provide means to keep spill cont empty
Overfill prevention shall alert transfer operator when tank is __% full - ANSWER
90%
Flapper Valves shall provide positive shut off when tank is filled to no more than __%
capacity - ANSWER 95%
Primary pressurized piping shall be tested for tightness hydrostatically at __% of
design operating pressure - ANSWER 150%
Date that all UST systems must have Line Leak Detector installed - ANSWER
November 9,2004
Secondary containment testing shall be done upon ____, __months, and every ___
months or ____ years thereafter - ANSWER Installation
6 months
36 months or 3 years
Owners/ops shall submit SCT results to local agency within ____ days of completion
- ANSWER 30 days
All monitoring equipment shall be tested, calibrated, operated, maintained, and
certified every ____ months. - ANSWER 12 months
Complete Solutions
Corrosion Specialist - ANSWER designs and certifies cathodic protection system
Secondary containment shall be constructed to contain at least the following
volumes: - ANSWER A. 100% of usable capacity of primary where there is only one
primary is within the secondary
B. 150% of the largest container if there are multiple primary containers in a single
secondary
Cathodic protection tester will test cathodic protection system within __ months of
installation and every __ years thereafter - ANSWER 6 months
3 years
Spill container shall meet the following requirements: - ANSWER A. If made of
metal, exterior wall shall be protected from galvanic corrosion
B. Shall have minimum capacity of 5 gallons (19 L)
C. Shall have drain valve which allows drainage of the collected spill into the primary
container or provide means to keep spill cont empty
Overfill prevention shall alert transfer operator when tank is __% full - ANSWER
90%
Flapper Valves shall provide positive shut off when tank is filled to no more than __%
capacity - ANSWER 95%
Primary pressurized piping shall be tested for tightness hydrostatically at __% of
design operating pressure - ANSWER 150%
Date that all UST systems must have Line Leak Detector installed - ANSWER
November 9,2004
Secondary containment testing shall be done upon ____, __months, and every ___
months or ____ years thereafter - ANSWER Installation
6 months
36 months or 3 years
Owners/ops shall submit SCT results to local agency within ____ days of completion
- ANSWER 30 days
All monitoring equipment shall be tested, calibrated, operated, maintained, and
certified every ____ months. - ANSWER 12 months