PETE 1010 Final Exam part 4 Questions
& Answers 2024/2025
MOSOP - ANSWERSmovement for the survival of the Ogoni People, founded by Ken Saro-Wiwa in the
1990s
The most important variable in the communications process is - ANSWERSfeedback
conductor pipe - ANSWERSThe casing string is usually put into the well first, particularly on land wells, to
prevent the sides of the hole from caving into the wellbore. This casing sometimes called drive pipe, is
generally a short length and is sometimes driven into the ground.
surface casing - ANSWERSthe casing string that protects the fresh water supply. It is always cemented
across the water zone and usually extends to surface.
intermediate casing - ANSWERSrun in deeper well, to protect and support casing the hole above the
zone(s) of interest
Production casing - ANSWERSonly run when well shows promise of production. Running and cementing
this is one of the first steps of well completion
An open-hole or barefoot completion - ANSWERSis one without casing
A LACT (Lease Automatic Custody Transfer) - ANSWERSunit can measure and record the volume of oil,
detect the presence of water in the oil stream, determine and record the temperature of the oil, allow
the verification of accuracy of flow meters, and determine the S&W content and API gravity of the oil
sold.
Roustabout - ANSWERSan unskilled or casual laborer, does whatever is needed
& Answers 2024/2025
MOSOP - ANSWERSmovement for the survival of the Ogoni People, founded by Ken Saro-Wiwa in the
1990s
The most important variable in the communications process is - ANSWERSfeedback
conductor pipe - ANSWERSThe casing string is usually put into the well first, particularly on land wells, to
prevent the sides of the hole from caving into the wellbore. This casing sometimes called drive pipe, is
generally a short length and is sometimes driven into the ground.
surface casing - ANSWERSthe casing string that protects the fresh water supply. It is always cemented
across the water zone and usually extends to surface.
intermediate casing - ANSWERSrun in deeper well, to protect and support casing the hole above the
zone(s) of interest
Production casing - ANSWERSonly run when well shows promise of production. Running and cementing
this is one of the first steps of well completion
An open-hole or barefoot completion - ANSWERSis one without casing
A LACT (Lease Automatic Custody Transfer) - ANSWERSunit can measure and record the volume of oil,
detect the presence of water in the oil stream, determine and record the temperature of the oil, allow
the verification of accuracy of flow meters, and determine the S&W content and API gravity of the oil
sold.
Roustabout - ANSWERSan unskilled or casual laborer, does whatever is needed