Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 5 páginas
Examen

Information Technology Project Management 9th Edition by Kathy Schwalbe, Verified Chapters 1 - 13, Complete Newest Version

Document preview thumbnail
Vista previa 2 fuera de 5 páginas

Information Technology Project Management 9th Edition by Kathy Schwalbe, Verified Chapters 1 - 13, Complete Newest Version

Vista previa del contenido

TEST BANK For Information Technology Project Management
9th Edition by Kathy Schwalbe, Verified Chapters 1 - 13,
Complete Newest Version
Projects should be developed in increments. - ANSWER:True

Managing the triple constraint primarily involves making trade-offs between
resources and quality. - ANSWER:False

It is necessary that IT project managers have prior technical experience in creating
and managing IT products. - ANSWER:False

The project scope statement, stakeholder requirements documentation, and
organizational process assets are the primary inputs for creating a WBS. -
ANSWER:True

Key outcomes of the executing process group are formal acceptance of the work and
creation of closing documents. - ANSWER:False

An important tool for project scope management is _____. - ANSWER:a work
breakdown structure

Monitoring and controlling processes overlap all of the other project management
process groups. - ANSWER:True

The _____ for an activity is the latest possible time an activity might begin without
delaying the project finish date. - ANSWER:late start date

_____ refers to the difference between planned and actual performance. -
ANSWER:Variance

The scope management plan can be informal and broad or formal and detailed,
based on the needs of the project. - ANSWER:True

Project scope statements must include the project boundaries, constraints, and
assumptions. - ANSWER:False

The _____ process involves gaining stakeholder and customer acceptance of the final
products and services and bringing the project, or project phase, to an orderly end. -
ANSWER:closing

The scope baseline in a WBS consists of the requirements documentation and
enterprise environmental factors. - ANSWER:False

, The executing tasks of the WBS remain constant from project to project. -
ANSWER:False

Scope creep refers to: - ANSWER:the tendency for project scope to keep getting
bigger and bigger.

A draft schedule for a project is most likely to be found in a _____. - ANSWER:Project
Charter

In the _____ stage of selecting information technology projects, organizations define
project scope, benefits, and constraints. - ANSWER:Project Planning

A Gantt chart is a standard format for displaying project schedule information by
listing project activities and their corresponding start and finish dates in a ____
format. - ANSWER:Calender

Which of the following is true about the agile method? - ANSWER:It uses several
iterations or deliveries of software instead of waiting until the end of the project to
provide a product.

After working with key stakeholders to define activities and calculate their resources,
the next process in project time management is to: - ANSWER:estimate the duration
of activities.

Some organizations initiate projects using a contract in place of a project charter. -
ANSWER:True

Project managers and their teams must keep in mind the effects of any project on
the interests and needs of the entire system or organization instead of focusing on
the immediate concerns of the project. - ANSWER:True

Project managers in matrix organizations have staff from various functional areas
working on their projects. - ANSWER:True

The tasks in a WBS must be developed as a sequential list of steps. - ANSWER:False

The _____ section of the project management plan describes how to monitor project
progress and handle changes - ANSWER:Project controles

A critical path: - ANSWER:determines the earliest completion date of a project.

The first process involved in project time management is _____ . - ANSWER:planning
schedule management

In a _____organizational structure, program managers, rather than functional
managers or vice presidents, report to the CEO. Their staffs have a variety of skills
needed to complete all required tasks within their programs. - ANSWER:Project

Libro relacionado
 image
Edición: 2006 ISBN: 9780619215286 Edición: Desconocido

Información del documento

Subido en
7 de septiembre de 2024
Número de páginas
5
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$18.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
3
Seguidores
0
Artículos
1282
Última venta
10 meses hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes