Instrument tech nccer Brainstorming Questions and Their Correct Solutions Graded 100% Pass

Document preview thumbnail
Vista previa 4 fuera de 70 páginas

1) When is the BEST time to document each loop check for commissioning ? A. Prior to the start of inspection B. When all test and inspection activities are complete C. When updating information on a daily basis D. At the time each test is completed - CORRECT ANSWER -D. At the time each test is completed (INST LVL4)(12410-16/ Section 3.2.0) 2) Teflon paste must not be used on : A. Nitrogen service B. Natural gas service C. Water service D. Oxygen service - CORRECT ANSWER -D. Oxygen service (INST LVL 1 )(12109- 14/Section 2.1.1) 3) A 24VDC power supply is not working . With your multimeter you verify no DC voltage . On the 120VAC input you measure 120V between hot and ground , and 72V between hot and neutral . What is the most likely cause of this ? A. Lost the ground B. Lost the hot C. Lost the neutral D. Lost the fuse - CORRECT ANSWER -C. Lost the neutral 4) Gain increase when tube : A. Back bends are made B. Bend radius increases C. Size decreases D. Long radius elbows are used - CORRECT ANSWER -B. Bend radius increases (INST LVL 2)(12302-15 section 2.1.1) 5) A temperature measuring device that produces a voltage as the temperature changes is a / an : A. RTD B. Thermistor C. Thermometer D. Thermocouple - CORRECT ANSWER -D. Thermocouple (INST LVL 2) (12110-15 section 1.2.2) 6) A pressure piping code is found in : A. ANSI B 31.1 B. NEC 690 . C. OSHA1910 . D. ISA S 5.1 - CORRECT ANSWER -A. ANSI B 31.1

Vista previa del contenido

Instrument tech nccer Brainstorming Questions and

Their Correct Solutions Graded 100% Pass

1) When is the BEST time to document each loop check for commissioning ? A. Prior to the start

of inspection

B. When all test and inspection activities are complete

C. When updating information on a daily basis


D. At the time each test is completed - CORRECT ANSWER ✔✔ -D. At the time each test is

completed (INST LVL4)(12410-16/ Section 3.2.0)

2) Teflon paste must not be used on :

A. Nitrogen service

B. Natural gas service

C. Water service


D. Oxygen service - CORRECT ANSWER ✔✔ -D. Oxygen service (INST LVL 1 )(12109-

14/Section 2.1.1)

3) A 24VDC power supply is not working . With your multimeter you verify no DC voltage . On

the 120VAC input you measure 120V between hot and ground , and 72V between hot and

neutral . What is the most likely cause of this ?

A. Lost the ground

,B. Lost the hot

C. Lost the neutral


D. Lost the fuse - CORRECT ANSWER ✔✔ -C. Lost the neutral


4) Gain increase when tube :

A. Back bends are made

B. Bend radius increases

C. Size decreases


D. Long radius elbows are used - CORRECT ANSWER ✔✔ -B. Bend radius increases (INST

LVL 2)(12302-15 section 2.1.1)

5) A temperature measuring device that produces a voltage as the temperature changes is a / an :

A. RTD

B. Thermistor

C. Thermometer


D. Thermocouple - CORRECT ANSWER ✔✔ -D. Thermocouple (INST LVL 2) (12110-15

section 1.2.2)

6) A pressure piping code is found in :

A. ANSI B 31.1

B. NEC 690 .

,C. OSHA1910 .


D. ISA S 5.1 - CORRECT ANSWER ✔✔ -A. ANSI B 31.1


7) When marking tubing for cutting , the preferred method is

A. Scribe a mark into the tube with a sharp object .

B. Mark the tube with a grease pencil

C. Mark the tube with a felt tip pen


D. Mark the tube with a crayon - CORRECT ANSWER ✔✔ -C. Mark the tube with a felt tip pen


8) An example of direct measurement indicator is a :

A. Pressure gauge

B. Bulb thermometer

C. Sight glass


D. Flowmeter - CORRECT ANSWER ✔✔ -C. Sight glass


9) On the image , how many hand valves are installed on Tank 1201C

A. 1

B. 2

C. 3


D. 4 - CORRECT ANSWER ✔✔ -C. 3


10) What is the first step in troubleshooting a problem in a system ?

, A. Turn off power to the instrument

B. Stimulate an input

C. Verify that there is a problem


D. Stimulate an output - CORRECT ANSWER ✔✔ -C. Verify that there is a problem


11) Where can the appropriate elevation of an instrument be found ?

A. Location drawing

B. P & ID

C. Flow diagram


D. Loop drawing - CORRECT ANSWER ✔✔ -A. Location drawing


12) Chemical cleaning of tubing attached to instruments may cause damage to sensor

A. Electronics

B. Paint

C. Elements


D. Bolts - CORRECT ANSWER ✔✔ -C. Elements


13) When making 90 - degree tubing bend , allowance for springback should be : A. 6 to 8

degrees

B. 4-5 degrees

C. 1 to 3 degrees

Información del documento

Subido en
2 de septiembre de 2024
Número de páginas
70
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$8.79

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
1
Seguidores
2
Artículos
699
Última venta
1 año hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes