ACI Written Test 2024 Study Guide The longest acceptable time for obtaining the first and final portions of a composite sample is 15 minutes. Once all concrete samples arrive at the testing location, they should be combined and remixed using a shovel to achieve uniformity. Testing for temperature, slump, and air content must begin within 5 minutes after obtaining the final portion of the composite sample. Molding strength specimens should start within 15 minutes after creating the composite sample. After acquiring a concrete sample, it must be safeguarded against sunlight, wind, rapid evaporation, contamination, and other sources of deterioration. The minimum volume for a sample used in strength testing should be 1 cubic foot. For sampling from a stationary mixer, two or more portions should be collected at regular intervals from the middle of the batch. These portions are then combined into one composite sample for testing. When sampling from a paving mixer, the contents should be emptied, and samples should be taken from at least five different areas of the pile. It is true that to prevent contamination or absorbent subgrades when discharging from a paving mixer, three shallow pans can be placed on the subgrade to collect samples. Concrete samples from a truck mixer should be taken before any water or admixtures are added at the job site, which is false; samples must be obtained after additives have been introduced. Two ways to obtain a sample from a revolving drum mixer include passing a receptacle through the entire discharge stream or diverting the discharge stream into a sample container. At least two portions should be collected from the middle of the discharge at evenly spaced intervals when sampling from a revolving drum truck mixer. It is false that the discharge rate can be regulated by adjusting the size of the gate opening. When sampling from a continuous mixer, concrete samples should not be taken until all mix proportion adjustments have been completed and after at least five cubic feet of concrete has been discharged. After combining sample portions from a continuous mixer into a composite sample, a minimum wait of 2 minutes and a maximum wait of 5 minutes is required before beginning tests. Samples from open-top truck mixers should be collected using the most suitable method to ensure representativity. If the concrete contains aggregate larger than can be handled by the molds or equipment, the sample must be wet-sieved. When wet sieving occurs, any mortar stuck to the sides of the sieves should be scraped back into the testing batch. Post wet-sieving, the composite sample must be remixed with a shovel to ensure uniformity before testing. It is false that ASTM C 1064 specifies a maximum temperature for fresh concrete. ASTM C 1064 may be used to verify ____________________________ with specifications. ️conformance Concrete containing aggregate with a nominal maximum aggregate size greater than 3 inches may require up to __________ minutes before the temperature stabilizes after mixing ️20 The temperature measuring device shall be capable of measuring the temperature of fresh concrete to ± ________ °F and throughout the range of __________ °F to __________ °F. ️1, 30, 120 The temperature measuring device shall be calibrated ________________, or whenever there is a question of _____________________. ️annually, accuracy Reference thermometers must be accurate and readable to ± __________ ° F. ️0.5 The accuracy of TMD's must be verified at ________ temperatures at least ____________ apart ️2, 30 degrees F The temperature of fresh concrete may be measured in the transporting equipment or forms providing there is at least 3" of cover. True or False ️true If transport equipment or forms are not used as the container, prior to sampling, you must __________________ the sample container used for obtaining the temperature of fresh concrete

Mostrar más Leer menos
Institución
Grado










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Estudio
Grado

Información del documento

Subido en
6 de agosto de 2024
Número de páginas
16
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

ACI Written Test 2024 Study Guide
The longest acceptable time for obtaining the first and final portions of a composite sample is 15
minutes.



Once all concrete samples arrive at the testing location, they should be combined and remixed using a
shovel to achieve uniformity.



Testing for temperature, slump, and air content must begin within 5 minutes after obtaining the final
portion of the composite sample.



Molding strength specimens should start within 15 minutes after creating the composite sample.



After acquiring a concrete sample, it must be safeguarded against sunlight, wind, rapid evaporation,
contamination, and other sources of deterioration.



The minimum volume for a sample used in strength testing should be 1 cubic foot.



For sampling from a stationary mixer, two or more portions should be collected at regular intervals from
the middle of the batch. These portions are then combined into one composite sample for testing.



When sampling from a paving mixer, the contents should be emptied, and samples should be taken
from at least five different areas of the pile.



It is true that to prevent contamination or absorbent subgrades when discharging from a paving mixer,
three shallow pans can be placed on the subgrade to collect samples.



Concrete samples from a truck mixer should be taken before any water or admixtures are added at the
job site, which is false; samples must be obtained after additives have been introduced.



Two ways to obtain a sample from a revolving drum mixer include passing a receptacle through the
entire discharge stream or diverting the discharge stream into a sample container.

,At least two portions should be collected from the middle of the discharge at evenly spaced intervals
when sampling from a revolving drum truck mixer.



It is false that the discharge rate can be regulated by adjusting the size of the gate opening.



When sampling from a continuous mixer, concrete samples should not be taken until all mix proportion
adjustments have been completed and after at least five cubic feet of concrete has been discharged.



After combining sample portions from a continuous mixer into a composite sample, a minimum wait of
2 minutes and a maximum wait of 5 minutes is required before beginning tests.



Samples from open-top truck mixers should be collected using the most suitable method to ensure
representativity.



If the concrete contains aggregate larger than can be handled by the molds or equipment, the sample
must be wet-sieved.



When wet sieving occurs, any mortar stuck to the sides of the sieves should be scraped back into the
testing batch.



Post wet-sieving, the composite sample must be remixed with a shovel to ensure uniformity before
testing.



It is false that ASTM C 1064 specifies a maximum temperature for fresh concrete.



ASTM C 1064 may be used to verify ____________________________ with specifications.
✔️conformance



Concrete containing aggregate with a nominal maximum aggregate size greater than 3 inches may
require up to __________ minutes before the temperature stabilizes after mixing ✔️20

, The temperature measuring device shall be capable of measuring the temperature of fresh concrete to ±
________ °F and throughout the range of __________ °F to __________ °F. ✔️1, 30, 120



The temperature measuring device shall be calibrated ________________, or whenever there is a
question of _____________________. ✔️annually, accuracy



Reference thermometers must be accurate and readable to ± __________ ° F. ✔️0.5



The accuracy of TMD's must be verified at ________ temperatures at least ____________ apart ✔️2,
30 degrees F



The temperature of fresh concrete may be measured in the transporting equipment or forms providing
there is at least 3" of cover. True or False ✔️true



If transport equipment or forms are not used as the container, prior to sampling, you must
__________________ the sample container used for obtaining the temperature of fresh concrete
✔️dampen



A composite sample of concrete is required even if the only purpose for obtaining the sample is to
determine temperature. True or False ✔️False



The thermometer sensor should be immersed a minimum of __________ inches into the concrete and
have at least ___________ inches of concrete cover in all directions. ✔️3, 3



After inserting the thermometer, the concrete must be pressed around the temperature measuring
device to prevent the __________________ ___________ temperature from affecting the reading
✔️ambient air



Leave the temperature measuring device in the concrete for at least _________ minutes, but not more
than _________ minutes before reading ✔️2, 5
$12.35
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
bestscores1 Kent State University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
12
Miembro desde
1 año
Número de seguidores
0
Documentos
1369
Última venta
1 mes hace
ReadEase

Welcome to ReadEase, your ultimate resource for exam preparation. At ReadEase, we specialize in providing comprehensive study materials and resources to help you excel in your exams. Whether you're preparing for standardized tests, professional certifications, or academic assessments, our finely curated collection covers a wide range of subjects and levels. From practice tests and study guides to expert tips and strategies, we're here to support your journey to success. ReadEase is committed to availing high-quality educational content, helping you thrive and achieve your academic and professional goals. Have any questions? We're just a message away.

Lee mas Leer menos
4.3

4 reseñas

5
2
4
1
3
1
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes