• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 2 fuera de 6 páginas
Examen

CFCM Practice Exam All Answers Correct

Document preview thumbnail
Vista previa 2 fuera de 6 páginas

CFCM Practice Exam All Answers Correct Key Procurement Concepts and Answers 1. Certificate of Competency: - A certificate issued by the Small Business Administration (SBA) stating that the holder is responsible for the purpose of receiving and performing a specific Government contract. 2. Freedom of Information Act (FOIA): - This law specifies how agencies must make their records available upon public request, imposes strict time standards for responses, and exempts certain records from public disclosure. 3. Required Elements in a Broad Agency Announcement (BAA): - Not a required element: An estimate of the level of effort required. ️ - Required elements include: - A description of the agency's research interest. - The criteria by which proposals will be selected. - The period of time during which proposals will be accepted. 4. Contractor Invention Assignment to Government: - A contractor may be required to assign title to an invention made under a federal R&D contract if the contractor does not have a place of business in the United States. 5. Contract Type for Construction: - The contract type generally used to acquire construction is Firm-Fixed-Price. 6. FAR Part 2: - This part specifies the definitions for words and terms that are to be used unless another FAR part provides a different definition. 7. Acquisition Team Role: - A true statement: The procurement policies and procedures used by members of the Acquisition Team are outlined in the FAR. 8. Market Research Indications: - If market research indicates that commercial or nondevelopmental items might not be available, the agency shall reevaluate the need and determine whether the need can be restated to permit commercial or nondevelopmental items to satisfy the agency's needs. 9. World Trade Organization Government Procurement Agreement: - True statements about acquisitions under this agreement must comply with specific international standards regarding transparency, fairness, and non-discrimination in procurement. 10. Maximum Fee for R&D under Cost-Plus-Fixed-Fee Contract: - The maximum fee that may be negotiated is 15 percent of the contract's estimated cost, excluding fee. 11. Emergency Acquisition Flexibilities: - Not justified by: The acquisition is to replace Government property that was involved in a crime. ️ - Justified by: - The acquisition is in support of a contingency operation. - The acquisition is to facilitate defense against a nuclear attack against the United States. - The President has issued a major disaster declaration. 12. Functions of the General Services Administration (GSA): - Not a function: Managing schedule contracting for military items. ️ - Functions include: - Authorizing other agencies to award schedule contracts. - Management of U.S. Federal property. - Publicizing regulations governing the acquisition of real property. 13. Examples of Information Technology: - Not an example: A building’s digital thermostat. ️ - Examples include: - Software development. - A computer hard drive. - A modem. 14. Cost-Reimbursement Contracts: - This type of contract allows for disallowing costs during the course of performance after the costs have been incurred, including various types of cost-reimbursement contracts, and letter contracts. When is consent to subcontract generally required? When the contractor has an approved purchasing system For agencies delegated authority to establish new Federal Supply Schedules, what must the contracting officer do prior to establishing such a contract? Obtain approval from the GSA Federal Supply Service If the information collected is still current, accurate, and relevant, a contracting officer may use market research conducted up to how long before the award of a task or delivery order 18 MO A contractor under a construction contract provides the Government with a quantity of unit-priced items other than the quantity called for. Can the Government or the contractor demand an adjustment in the contract price? Yes, if the variation exceeds plus or minus 15 percent of the expected quantity Which FAR Part prescribes policies and procedures unique to the acquisition of commercial items? 12 Which of the following contract modifications needs to be signed by both the contractor and the

Vista previa del contenido

CFCM Practice Exam All Answers Correct
Key Procurement Concepts and Answers



1. Certificate of Competency:

- A certificate issued by the Small Business Administration (SBA) stating that the holder is responsible
for the purpose of receiving and performing a specific Government contract. ✅



2. Freedom of Information Act (FOIA):

- This law specifies how agencies must make their records available upon public request, imposes strict
time standards for responses, and exempts certain records from public disclosure. ✅



3. Required Elements in a Broad Agency Announcement (BAA):

- Not a required element: An estimate of the level of effort required. ✔️

- Required elements include:

- A description of the agency's research interest.

- The criteria by which proposals will be selected.

- The period of time during which proposals will be accepted.



4. Contractor Invention Assignment to Government:

- A contractor may be required to assign title to an invention made under a federal R&D contract if the
contractor does not have a place of business in the United States. ✅



5. Contract Type for Construction:

- The contract type generally used to acquire construction is Firm-Fixed-Price. ✅



6. FAR Part 2:

- This part specifies the definitions for words and terms that are to be used unless another FAR part
provides a different definition. ✅

, 7. Acquisition Team Role:

- A true statement: The procurement policies and procedures used by members of the Acquisition
Team are outlined in the FAR. ✅



8. Market Research Indications:

- If market research indicates that commercial or nondevelopmental items might not be available, the
agency shall reevaluate the need and determine whether the need can be restated to permit
commercial or nondevelopmental items to satisfy the agency's needs. ✅



9. World Trade Organization Government Procurement Agreement:

- True statements about acquisitions under this agreement must comply with specific international
standards regarding transparency, fairness, and non-discrimination in procurement.



10. Maximum Fee for R&D under Cost-Plus-Fixed-Fee Contract:

- The maximum fee that may be negotiated is 15 percent of the contract's estimated cost, excluding
fee. ✅



11. Emergency Acquisition Flexibilities:

- Not justified by: The acquisition is to replace Government property that was involved in a crime. ✔️

- Justified by:

- The acquisition is in support of a contingency operation.

- The acquisition is to facilitate defense against a nuclear attack against the United States.

- The President has issued a major disaster declaration.



12. Functions of the General Services Administration (GSA):

- Not a function: Managing schedule contracting for military items. ✔️

- Functions include:

- Authorizing other agencies to award schedule contracts.

- Management of U.S. Federal property.

- Publicizing regulations governing the acquisition of real property.

Información del documento

Estudio
Subido en
5 de agosto de 2024
Número de páginas
6
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$11.12

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
bestscores1
4.4
(5)
Vendido
20
Seguidores
0
Artículos
1369
Última venta
1 mes hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes