Commercial construction Midterm
building construction and operation - ANS-The area of human activity that consumes the most
energy is
alternative sources of water - ANS-Rainwater harvesting and gray water are
Energy star - ANS-Appliances that perform in the top 25 percent of their product class in terms
of every use are called ____________ appliances.
Through its entire life cycle - ANS-The costs of building a green facility should be considered
___________
Consistent way to evaluate and compare buildings. - ANS-A green building rating system is a
Project registration - ANS-The first step in the LEED certification process for a building is
________
Sustainable sites - ANS-The LEED credit that covers construction activity is __________
Materials and resources - ANS-Using locally sourced material for construction is an example of
a LEED _______ credit.
area that may be contaminated - ANS-A brownfield is a ___________
Regional priority - ANS-The LEED credit that rewards projects that address local environmental
issues is ___________
Monthly - ANS-Formal safety meetings are typically held ________________
increase worker knowledge and improve skills - ANS-The intent of safety training is to
_______________
procedures for dealing with the press - ANS-OSHA requires all of the following elements in
emergency-response plans EXCEPT
emergency response personnel - ANS-the first line of defense in an emergency is the _______
the frequency depends on the job site - ANS-How often are safety inspections, audits, and
observations performed?
building construction and operation - ANS-The area of human activity that consumes the most
energy is
alternative sources of water - ANS-Rainwater harvesting and gray water are
Energy star - ANS-Appliances that perform in the top 25 percent of their product class in terms
of every use are called ____________ appliances.
Through its entire life cycle - ANS-The costs of building a green facility should be considered
___________
Consistent way to evaluate and compare buildings. - ANS-A green building rating system is a
Project registration - ANS-The first step in the LEED certification process for a building is
________
Sustainable sites - ANS-The LEED credit that covers construction activity is __________
Materials and resources - ANS-Using locally sourced material for construction is an example of
a LEED _______ credit.
area that may be contaminated - ANS-A brownfield is a ___________
Regional priority - ANS-The LEED credit that rewards projects that address local environmental
issues is ___________
Monthly - ANS-Formal safety meetings are typically held ________________
increase worker knowledge and improve skills - ANS-The intent of safety training is to
_______________
procedures for dealing with the press - ANS-OSHA requires all of the following elements in
emergency-response plans EXCEPT
emergency response personnel - ANS-the first line of defense in an emergency is the _______
the frequency depends on the job site - ANS-How often are safety inspections, audits, and
observations performed?