what are the steps to starting a project? - Answer -Establish a project need (why)

-Define project scope (what)

-Understand team members (who)

-Confirm critical authorities and milestones (when)

-Define project tools and protcool (how)

what are the project parameters? - Answer Cost, schedule, quality

what are the four crtical P to selecting a team? - Answer Process (delivery method),
product (type of building), Proximity (Location), people (each other)

What does the overall project schedule include? - Answer All activities/members of the
project

What does FFE stand for? - Answer Furniture, fixture, and equipment

what are the most important days in construction? - Answer the first 60 days and the last
60 days

what does the budget mean? - Answer how much you can spend

what does the estimate mean? - Answer how much you are going to spend

what is billing mean in terms of costs? - Answer how much you actually spend

What is included in project cost? - Answer design, preconstruction, profit and overhead

what are the steps to closing a project? - Answer 1. transmit closeout documents

2. Train and orient maintance team

3. Final change orders

4. Archive project documents

5. celebration

which delivery methods have multiple estimates in design? - Answer cm at risk, design
build, integrated project delivery

what are some scope that can affect the cost of a project? - Answer -use of building,
site, sustainability, subtotal A

, What is subtotal A - Answer Size, duration, scope

what is subtotal b - Answer location

what are some affects on subtotal b location - Answer freight/delivery, labor and unions,
site and soils (foundations), urban or rural logistics, weather (NOAA), taxes, permits,
regulations

what are things that can affect timing in a conceptual estimate? - Answer when you are
going to start the project, summer/winter, inflation (3-4% a year), escalation, demand of
trade market

what are the cost for design continegency for Schematic, DD, and CD - Answer sd - 10%

DD- 5%

CD-0%

What is the percent cost for preconstruction services usually? - Answer 1%

what are the key 10 steps to scheduling? - Answer 1. Project delivery

2. Overall project schedule (identify key memebrs)

3.Site analysis

4. Site Logistics

5. Building analysis

6. sequencing

7.milestones

8. Long lead

9. Building Systems

10. Plan 4 times

what are the three R's? - Answer -Risk

-Resources

-Reward

What does Risk mean in the three R's for tatical? - Answer scope, performance of trades
and team

what does resources mean in the three R's for tatical? - Answer Capacity of trades and
team

Información del documento

Subido en
2 de agosto de 2024
Número de páginas
7
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$10.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Flat
3.6
(5)
Vendido
41
Seguidores
5
Artículos
2117
Última venta
5 meses hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes