Lead supervisor Question and answers correctly solved
Lead supervisor Question and answers correctly solved Lead waist that fails the TCLP is considered RCRA hazard waist -True or false ? - correct answer True N,R or P100 respirator cartridges are acceptable for lead related work-T or F - correct answer True CDPH requires a lead abatement plan when conducting paint film stabilization-T or F - correct answer False Final clearance would be required for permanent abatement in public buildings-T or F - correct answer True Waste Characterization can include three steps:____,STLC and TCLP - correct answer TTLC Clearance criteria for exterior horizontal surfaces is ______ug/ft - correct answer 400 When conducting personal air sampling for exposure assessments use a flow rate of between___to___liters per minute. - correct answer 1 to 4 replacement soil used for backfill after soil removal can contain no more than ______ppm lead content. - correct answer 200ppm if you use a negative pressure enclosure for lead abatement how many air changes per hour are recommended under the HUD Guidelines. - correct answer 10 When can a individual
Document information
- Uploaded on
- July 24, 2024
- Number of pages
- 10
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers