• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 4 fuera de 117 páginas
Examen

UST Study Guide with Correct solutions Graded A+ ..100% Pass

Document preview thumbnail
Vista previa 4 fuera de 117 páginas

UST Study Guide with Correct solutions Graded A+ ..100% Pass 47.) Within _____ calendar days of receiving an inspection report from either the local agency or the special inspector, the permit holder shall implement the corrections specified in the inspection report. a.) 30 b.) 45 c.) 60 d.) 15 - Answer a.) 30 CCR Title 23, Sec 2712(f) 57.) When an underground storage tank system is temporarily closed, an operator must do all of the following, except: a.) All residual liquid, solids, or sludge's shall be removed and handled in accordance with the applicable provisions of the Health & Safety Code. b.) Maintain corrosion protection c.) Cap and secure the vent line d.) If the UST contained a hazardous substance that could produce flammable vapors at standard temperature and pressure, it shall be inverted. - Answer d.) If the UST contained a hazardous substance that could produce flammable vapors at standard temperature and pressure, it shall be inverted. **Should be "inerted," not "inverted." CCR Title 23, Sec 2671(a) A 10,000-gallon, gasoline, single wall UST is routinely filled to 9,000-gallons. All of the following are authorized monitoring alternative for single wall pressurized tanks, EXCEPT? a. Monthly ATG 0.2 gph test when the tank contains 7,000 gallons of fuel. b. Manual inventory reconciliation and a monthly ATG 0.1 gph test with 3 feet of product in the tank. c. Monthly SIR 0.2 gph test with a biennial tank integrity test d. Vadose zone monitoring with wells located in the backfill surrounding the tank. - Answer a. Monthly ATG 0.2 gph test when the tank contains 7,000 gallons of fuel. CCR; 2643 (b) A description of the evaluation procedures for leak detection equipment is found in 23 CCR, Division 3, Chapter 16, Appendix a. I b. II c. III d. IV - Answer d. IV Found in CCR appendix A facility has a single wall tank and has chosen statistical reconciliation plus tank integrity testing as their quantitative release detection method. The following statements are false about this method, except: a.) A tank integrity test shall be conducted once every year. b.) Statistical inventory reconciliation shall be conducted at least once per month in accordance with section 2646.1. c.) The SIR method shall be capable of detecting a release of 0.1 gallon per hour. d.) The product level in the tank is at least 5 feet. - Answer b.) Statistical inventory reconciliation shall be conducted at least once per month in accordance with section 2646.1.


Información del documento

Subido en
20 de julio de 2024
Número de páginas
117
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas
$11.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
6
Seguidores
1
Artículos
1897
Última venta
6 meses hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes

Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.