Acq 101 Module 9 Verified Solutions
ACQ 101 MODULE 9 VERIFIED SOLUTIONS Best practice PBL programs use incentives that promote behaviors and outcomes that benefit both the customer and supplier ️True Developing support outcomes and capturing them in a Performance Work Statement (PWS) is a fundamental effort in establishing properly structured Performance Based Logistics (PBL) contracts. ️True DoD Instruction 5000.02 requires that a LCSP be developed and provided as part of the program approval process to document how the sustainment strategy is being implremented. ️True Logisticians and engineers who perform sustainment analyses should have a basic understanding of operations, system missions and profiles and the system capabilites. ️True The Product Support Business Model (PSBM) was developed to assist the PM and PSM, who must be tightly aligned, with the numerous supportablity considerations and trade-offs that take place during the development and fielding of a weapon system. ️True Traditional/Transactional Based Logistics support organizations through PSAs ️False What is the primary life cycle sustainment objective of the Engineering and Manufacturing Development (EMD) phase? ️Developing the requirements for the long-term performance-based support concepts Which of the following IPS Element involves the identification, review, assessment, and resolution of deficiencies throughout a system's life cycle? ️Sustaining Engineering Which of the following metrics is a top-level outcome-based metrics based on the JCIDS? ️Availability Which two measurement elements combine to form availability, the most common measure of system effectiveness? ️Reliability and Maintainability Why is designing for sustainment a critical function for military equipment? ️T
Información del documento
- Subido en
- 20 de junio de 2024
- Número de páginas
- 2
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas