• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 4 fuera de 138 páginas
Examen

Test Bank For Project Management in Practice 7th Edition by Jack R. Meredith, Scott M. Shafer, Complete Latest Guide.

Document preview thumbnail
Vista previa 4 fuera de 138 páginas

Test Bank For Project Management in Practice 7th Edition by Jack R. Meredith, Scott M. Shafer, Complete Latest Guide. Chapter 1: The World of Project Management True/False 1. A primary purpose of forming projects is to assign the responsibility for accomplishing some organizational task to a specific person or small group. Answer: True Response: See section 1.1 Level: easy 2. One of the few similarities between project management and general management is that both exist in the well-defined organizational structure of superior/subordinates in the overall organization. Answer: False Response: See section 1.2 Level: medium 3. Many recent developments in project management are being driven by changes in the nature of the American workforce. Answer: False Response: See section 1.1 Level: medium 4. There has been a growing use of projects to achieve an organization’s strategic goals Answer: True Response: See section 1.1 Level: medium 5. While general managers have their authority limited to specific areas in the overall organization, project managers have authority over any activity required by the project. Answer: False Response: See section 1.2 Level: medium 6. Projects are always carried out under conditions of uncertainty. Answer: True Response: See section 1.3 Level: easy 7. One can trade-off time and cost when managing a project, but the project’s technical specifications must be maintained exactly as the client initially specifies. Answer: False Response: See section 1.3 Level: medium 8. Nonnumeric project selection methods are only suitable if numeric methods are not available. Answer: False Response: See section 1.5 Level: medium 9. When using financial methods for selecting projects, the payback period is the simplest and best method to use. Answer: False Response: See section 1.5 Level: medium 10 Rank-ordering a large number of projects can be done with a Q-sort. Answer: True Response: See section 1.5 Level: medium 11. A disadvantage of using the payback period method for selecting projects is that it cannot reflect the time-value of money. Answer: True Response: See section 1.5 Level: medium 12. A disadvantage of using the discounted cash flow method (or net present value) for selecting projects is that it ignores all non-monetary factors associated with the project except risk. Answer: True Response: See section 1.5 Level: medium 13. A disadvantage of using scoring models rather than financial models for selecting projects is that they cannot include the project’s profitability. Answer: False Response: See section 1.5 Level: medium 14. A PM does not need to understand why a project is selected for funding because he did not initiate the process. Answer: False Response: See section 1.5 Level: medium 15. The main distinction between platform and breakthrough projects is that the former usually depend on existing technology. Answer: True Response: See section 1.6 Level: medium 16. The main distinction between platform and derivative projects is that the latter depend on existing technology. Answer: False Response: See section 1.6 Level: medium 17. One reason for the emphasis on project management is that tasks fit neatly into business-as-usual. Answer: False Response: See section 1.1 Level: easy 18. Programs are subdivisions of projects. Answer: False Response: See section 1.1 Level: easy 19. Projects are subdivisions of programs. Answer: True Response: See section 1.1 Level: easy .


Información del documento

Subido en
11 de abril de 2024
Número de páginas
138
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas
$25.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Tutorexpert01
3.9
(161)
Vendido
1039
Seguidores
815
Artículos
5506
Última venta
3 semanas hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes

Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.