Contractors Exam Already Graded A+
Contractors Exam Already Graded A+ If an applicant for the master or journey license examination fails the exam twice within two years, what is required to re-test? Wait one year and provide proof of completion of an approved class. On the jobsite, what is the ratio of registered apprentices to journey or master electricians? Residential job site: 2 apprentices to one journey (or master) - all other job sites: 1 to 1 How many hours of related experience are required to qualify for a Sign Specialist license? less than 4000 hours of experience, obtained over a period of not less than two years. An Electrical Contractor is required to either _____________________. Not Have a master electrician license or employ a full time master electrician. For a journey or sign specialty license, how many maximum hours may be applied toward the license application time requirement, for the holder of a Bachelor of Electrical Engineering Degree? 2000 hours Out of state, temporary Journey license may be issued for how long? 90 days Applications for an electrical exam must be accepted and on file in Lansing for not less than _________________? 20 business days before the next scheduled exam What is the only electrical license that requires public liability insurance before a license is issued? Sign Specialty Contractor License. $1,000,000 policy When do electrical contractors license expire? Every three years How many Code Update class hours are required to renew a Sign Specialist License? 8 Hours The minor violation of a contractor beginning work before a permit is applied for will result in a fine of how much? $25 for beginning without a permit and an additional $50 if a permit is not applied for in at least 8 days What is the contractor's fine for the minor violation of employing an unregistered apprentice worker? $25 initial fine and then $75 additional if the violation continues Apprentice registrations must be submitted within how many days after employment When do apprentice registrations expire? 30 days August 31 of each year (renew within 30 days) In an industrial setting, the employer and who else must sign an employment affidavit? electrician Part 8 of the Michigan Electrical Code, is also known as? A master The Michigan Electrical Code or The Code Certificate of final inspection, may be requested by? The permit holder The enforcing agency may require who to be present, on the job, for an inspection? Representative of the permit holder Plans and or specifications may be required for a permit, if the electrical service is? 400 amps and the square footage of the floor plan is more than 3500 sq ft. What is the minimum time required to schedule an electrical inspection? When can electrical wiring be concealed? 24 hours. A More than Only after wiring is approved by the enforcing agency. What is another name for Public Act 497 Who is entitled to a construction lien? Construction Lien Act Each contractor, subcontractor, supplier, or laborer who provides an improvement to real property shall have a construction lien upon the interest of the owner or lessee who contracted for the improvement to the real property. How much is the construction lien recovery fund assessment for electrical contractors? $10 initial and $10 per year for renewal (3yrs @ $30) What is the assessment for a person with multiple licenses? The construction Lien Act defines a residential structure as? more than 2 residential units. What is not considered to be a structure? $10 for each license A residential building containing not Heavy civil construction such as: highway, bridge, dam, airport landing facility, mine, reservoir, port facilities, ect. A "Bed and Breakfast" is considered to be? A single family residential structure What are the number of members on the State Construction Code Commission? permanent and 12 appointed by the Governor. 10 17 Total, Five What is the maximum number of sleeping rooms in a Bed and Breakfast including the innkeeper's
Document information
- Uploaded on
- March 12, 2024
- Number of pages
- 4
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers