API 1169 Study Test Questions Test RM 2 Already Passed
API 1169 Study Test Questions Test RM 2 Already Passed According to OSHA a "protective system" is defined as: Method of protecting employees from cave-ins. Design and development inputs shall be identified and reviewed for? Accuracy, completeness and lack of conflict The Excavator calls the One Call Center prior to excavation at least Two working days nor more than ten working days Encroachment Area is the area where the ground disturbance occurs within: 50 feet of the centerline of the existing facility (or ROW) or other easement The pressure recorders and deadweight gauge shall be located at a safe distance at least: 100 feet from the facility being tested In compliance with the Uniform Color Code the route and or area to be excavated shall be identified by: White markers Markings may include one or any combination of the following: paint, chalk, flags, stakes, brushes, or offsets. Matching markings to existing and expected surface conditions is the responsibility of? Facility Owner Subpart G of 49CFR192 prescribes minimum requirements for: Construction of transmission pipelines and mains. If a newspaper was seeking information about the project, are inspection personnel allowed to interac with them to answer their questions? Only if expressly allowed Before placing new gas pipelines in service all piping and components must be subjected to: 125% of MOP (maximum operational pressure) of the system for 4 hours A detailed design developed from operating requirements and conforming to Code requirements including all necessary drawings and specifications, goveming a liquid petroleum pipeline installation is also known as? Engineering design Planned, systematic, and preventative actions that are required to ensure that materials, products and services will meet specified requirements is called? Quality Control system Any physical objects detected by an in-line inspection device that may be anomalies, components, nearby metallic objects, or some other item are also known as? Features Which describes "rework" the best? Any grinding or welding on a completed weld to correct potentially rejectable indications General basic requirements for Chief Inspector qualification are? Environmental and pollution control What type of hazard is a waterway crossing? Site-Specific What would a continuous run of pipe between adjacent blocks valves be called? A pipeline section Does a section of pipe removed and scheduled for reuse, but then reinstalled in the same loca need to be retested? No testing required
Información del documento
- Subido en
- 11 de marzo de 2024
- Número de páginas
- 16
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas