Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 6 páginas
Examen

CATEGORY 3 NON-CAB OPERATED TEST Questions and Revised Correct Answers (2026 / 2027) 100% Guarantee Pass

Document preview thumbnail
Vista previa 2 fuera de 6 páginas

This document contains questions and verified answers for CATEGORY 3 NON-CAB OPERATED TEST . It includes detailed explanations, revision-focused content, and exam preparation material suitable for 2026/2027 students.

Vista previa del contenido

CATEGORY 3 NON-CAB OPERATED
TEST

Bridge cranes with rated capacities of 20,000 lbs. or greater are classified as ______ cranes -
ANSCategory 2

The expiration date that is of particular importance to crane operators is - ANSThe certification
expiration date of the crane

Who is primarily responsible for evaluating a Crane Operators physical and emotional fitness -
ANScrane operator

A monorail hoist with less than 20,000 lbs. capacity is a ________________ crane. -
ANSCategory 3

Components that control, restrain, or position the load, and upon failure would cause dropping,
shifting or uncontrolled movement of the loads are ____________. - ANSload controlling parts

All of the following require a license to operate EXCEPT a: - ANSNon-cab operated category
3-bridge crane

What is two-blocking and why is two-blocking dangerous? - ANSTwo-blocking occurs when the
hook block comes in contact with the upper sheave block during hoisting of the hook. It is
dangerous because it could result in damage to the crane, parting of the hoist lines, and
dropping the load.

The formula for determining the area of a triangular shaped object is: - ANSBase x Height
divided by 2

When are operators required to perform a pre-use check of the crane? - ANSPrior to the first
use of the crane each day.

Regardless of the method of communication used all crane signals must be
____________________. - ANSclear

Synthetic web slings should NOT be used in areas where temperatures exceed 194 degrees
Fahrenheit. - ANSTrue

If an object is 6 feet long, 5 feet wide, and 4 feet high, what is the volume of the object? -
ANS120 cubic feet

, Is it necessary for the operator to see the load or work area? - ANSNot if there is a designated
signal person who is in control of the lift and is in view of the operator, or if the signal giver is in
constant radio contact with the operator.

What is "inching"? - ANSPerforming a motion very slowly, a little at a time

The majority of crane accidents are attributed to which of the following? - ANSPersonnel error

Crane operators at naval activities may be required to operate various types of cranes for which
they hold a license. Which of the following can best assure operator proficiency and safety? -
ANSBe familiarized by a qualified person before operating the crane for the first time

Which of the following is NOT an acceptable method of communication between the signal
person and the crane operator? - ANSSignal Flags

Which of the following is used with a physical locking device placed at the energy source? -
ANSLockout Tag

Which of the following is considered to be the best way the operator can ensure the crane is
safe to operate on any given day? - ANSPerform Daily Pre-use Checks

When crane accidents happen, you must do all of the following EXCEPT: - ANSContinue to
operate the crane until all lifts are completed

Components that provide protection for operation and maintenance personnel working on or in
the path of cranes. - ANSGeneral Safety Devices

If the crane operator and the rigger in charge disagree on whether or not a load is safe to lift the
operator should: - ANSnot operate the crane until contacting the supervisor to resolve the issue.

Components that support the load, and upon failure would cause dropping or uncontrolled
lowering of the load are ____________. - ANSload bearing parts

What is meant by "skewing"? - ANSWhere one end of the bridge gets ahead of the other end,
frequently causing binding on the rails.

What are the principal parts of an overhead traveling crane? - ANSBridge girders, end trucks,
trolley, and operator's cab or pendant control

Why shall sudden starts and stops of the bridge and trolley be avoided? - ANSSudden starts
and stops could cause the trolley or bridge to derail

Información del documento

Subido en
29 de febrero de 2024
Número de páginas
6
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas
$10.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Ashley96
4.0
(174)
Vendido
648
Seguidores
200
Artículos
5546
Última venta
2 días hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes