SAFe 6.0 Product Owner/Product Management Cert Study Guide with correct answers
During PI Planning, teams decompose _______ into ____ in the backlog and establish their ___________ - Correct Answer-Features, Stories, PI Objectives What domains cover Built In Quality - Correct Answer-1. Business Functions 2. Software Applications 3. IT Systems 4. Hardware 5. Cyber-physical systems The ART Backlog is a _____ system that is used to capture and manage the ______ and ________ intended to enhance the solution and extend its ___________ . - Correct Answer-Kanban, features, enablers, architectural runway The Solution Train Backlog is a Kanban system that is used to capture and manage the ______ and ______ intended to enhance the _______ and extend its architectural runway. - Correct Answer-capabilities, enablers, large solution The ART and Solution backlogs capture the Solution's upcoming: - Correct Answer-Features, Capabilities, and N
Escuela, estudio y materia
- Institución
- SAFe 6.0
- Grado
- SAFe 6.0
Información del documento
- Subido en
- 24 de febrero de 2024
- Número de páginas
- 4
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
safe 60 product ownerproduct management cert stu
Documento también disponible en un lote