NERC RC Exam| 102 questions| with complete solutions
NERC RC Exam| 102 questions| with complete solutions Common standard time period for station battery to handle outage of AC power to chargers Answer-8-12 hours Time to restore data exchange redundancy when redundancy testing by RC/TOP/BA deemed unsuccessful Answer-2 hours Transition period to backup control facility (fully functioning) Answer-2 hours Annual testing of backup control facility must prove to be functional for this long Answer-2 hours Every 2 years TO/TOP/DSP must provide how many hours of system restoration training to field switching personnel Answer-2 hours Every 2 years GOP's with blackstart resources shall provide how many hours of training to operating personnel responsible for startup Answer-2 hours BAL-002 default contingency reserve restoration period (following disturbance recovery period) Answer-90 minutes How often should BA calculate and record inadvertent interchange Answer-60 minutes/hourly How often should BA provide MW-hour meter readings to adjacent BA's Answer-60 minutes/hourly TLR procedure (identifying TLR level and actions to be implemented) needs updating how often Answer-60 minutes/hourly Hourly ATC for next 48 hours calculated how often Answer-60 minutes/hourly During EEA2/3 the energy deficient entity needs to update the RC how often until alert is terminated Answer-60 minutes/hourly
Escuela, estudio y materia
- Institución
- NERC
- Grado
- NERC
Información del documento
- Subido en
- 18 de enero de 2024
- Número de páginas
- 9
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
common standard time period for station battery to
-
time to restore data exchange redundancy when redu
-
transition period to backup control facility full
Documento también disponible en un lote