Api 936 Practice Test Questions And Correct Answers
API 936 PRACTICE TEST QUESTIONS AND CORRECT ANSWERS What does the scope of API 936 provide? Provides installation quality control guidelines for monolithic refractory lining and may be used to supplement owners specifications What section of API 936 mentions the responsibilities of the inspector? The scope of the inspector responsibilities who monitor and control the quality control process are also defined What two items if using API 936 are mandatory to be done? The refractory applied by this guideline shall be sampled and tested to verify that physical properties meet intended criteria What is the acceptance / rejection criteria for qualifications testing as per API 936? For both material and applicator qualification testing, the average physical properties for each sample shall fully meet the criteria established for that material in API 936 What are the acceptance / rejection criteria for as-installed testing? Based on criteria and procedure prior to work to start What are the qualifications of inspection personnel? 1. The inspector shall have no commercial affiliations with the contractor or manufacturer(s), unless otherwise agreed to by the owner 2. The inspector shall have a working knowledge of applicable standard and terms as defined in attached appendixes of this document 3. The inspector shall have a working knowledge or requirements defined in this document, owner specifications and job specific requirements outlined by the owner or manufacturer. What are the responsibilities of inspection personnel? 1. The inspector shall monitor qualification and production work conducted by the manufacturer(s) and contractor to ensure compliance with job specifications and agreed-to-quality standards 2. The inspector shall notify the owner and the contractor in a timely manner of any work deficiencies or potential deficiencies based on his or her monitoring of material qualification and the installation process 3. The inspector shall make no engineering decisions contrary or in addition to specified requirements 4. Any conflict between specified standards and installed refractory quality shall be submitted to the owner for resolution 5. In cases involving repair and maintenance of existing equipment, the owner may request the inspector to provide recommendations concerning the need and extent of repairs and procedures to be used to make those repairs 6. The inspector shall inspect the hammer test newly-installed lining before dry out and after dryout (when possible), and report any anomalies to the owner 7. The inspector shall ensure the material and applicator qualification test results are
Información del documento
- Subido en
- 13 de enero de 2024
- Número de páginas
- 12
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas