S-12 CITYWIDE SPRINKLER SYSTEMS, S12 Sprinkler Test (2023/2024) Rated A
S-12 CITYWIDE SPRINKLER SYSTEMS, S12 Sprinkler Test (2023/2024) Rated A THE __________ IS RESPONSIBLE TO MAINTAIN SPRINKLER SYS. AND TO DETERMINE QUALIFICATIONS. OWNER RECORDS OF ALL INSPECTIONS AND MX SHALL BE MAINTAINED ON PREMISES FOR A MIN. OF __________ YEARS. 3 THE BUILDING OWNER SHALL ASSIGN A(N) ____________ TO COMPLY WITH REQUIREMENTS. IMPAIRMENT COORDINATOR REGULAR MX AND MINOR REPAIRS NOT AFFECTING MORE THAN ________ FLOOR(S) ARE CONSIDERED PLANNED REMOVAL FROM SERVICE. 1 SHUTDOWNS AFFECTING MORE THAN _________ FLOOR(S) ARE CONSIDERED UNPLANNED OUT OF SERVICE CONDITIONS. 1 NOTIFICATION TO FDNY IS NOT REQUIRED, PROVIDED SYSTEM IS RETURNED TO SERVICE WITHIN ______ HOURS. 8 FOR UNPLANNED REMOVAL FROM SERVICE, THE COF HOLDER SHALL IMMEDIATELY REPORT CONDITION TO THE ___________ AND THE FIRE DEPT. OWNER OF THE BUILDING IF A MINOR DEFECT IS OBSERVED, IT SHALL BE CORRECTED WITHIN _________ DAYS OR IT WILL BE CONSIDERED AN IMPAIRMENT. 30 WHAT DOES "OOS" STAND FOR? OUT OF SERVICE OOS SYSTEMS SHALL BE IDENTIFIED BY PLACING ________ AT FIRE DEPT. CONNECTIONS, SYS. CONTROL VALVES, AND FIRE COMMAND CENTER TAGS A _______ SHALL BE REQUIRED TO POST TAGS AT MAIN CONTROL VALVE AND ANY SECTIONAL VALVES. MASTER FIRE SUPPRESSION PIPING CONTRACTOR __________ SHALL BE POSTED ON THE TAG INDICATING BOTH STATIC AND FLOW PRESSURES BEFORE AND AFTER. DRAIN TEST RESULTS GREEN TAGS INDICATE THAT __________. NO IMPAIRMENT WAS FOUND GREEN TAGS WILL BE PLACED ON THE ____________. MAIN CONTROL VALVE SYSTEMS PARTIALLY OR FULLY OUT OF SERVICE SHALL HAVE A ____________ TAG PLACED ON THE MAIN CONTROL VALVE. RED A _________ DISC OF 8-9 INCHES SHALL BE PLACED ON CONNECTIONS TO INDICATE THE SYSTEM IS FULLY OUT OF SERVICE. WHITE A ________ DISC OF 8-9 INCHES SHALL BE PLACED ON CONNECTIONS TO INDICATE THE SYSTEM IS PARTIALLY OUT OF SERVICE. BLUE THE IMPAIRMENT COORDINATOR WILL NOTIFY THE ___________ CARRIER, CENTRAL STATION AND OCCUPANTS. INSURANCE PRIOR TO RETURNING A SYS. TO SERVICE, THE ___________ SHALL ENSURE THAT NECESSARY TESTS AND INSPECTIONS ARE CONDUCTED. IMPAIRMENT COORDINATOR GLYCERIN NOT GREATER THAN _________ PERCENT OR GLYCOL NOT GREATHER THAN ________ PERCENT SHALL BE USED TO PROTECT FROM FREEZING. 50, 40 THE COF NUMBER AND SIGNATURE OF COF HOLDER SHALL BE POSTED NEAR THE ____________. MAIN CONTROL VALVE __________ SHALL BE READILY AVAILABLE TO
Escuela, estudio y materia
- Institución
- S-12 CITYWIDE SPRINKLER SYSTEMS, S12 Sprinkler
- Grado
- S-12 CITYWIDE SPRINKLER SYSTEMS, S12 Sprinkler
Información del documento
- Subido en
- 11 de enero de 2024
- Número de páginas
- 35
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
s 12 citywide sprinkler systems s12 sprinkler tes
Documento también disponible en un lote