UST Service Technician Questions And Answers Rated A+ New Update Assured Satisfaction
Type A Fire Extinguisher - Puts out paper, wood, cloth, rubbish fires. Type B Fire Extinguisher - Puts out flammable and combustible liquids. Type C Fire Extinguisher - Puts out electrical fires. According to CCR, Title 23 UST Regulations, what is the frequency that the monitor system certification must be performed? - 12 month If visual monitoring is utilized as the means of release detection for a single walled tank, it must be conducted on a _____ basis. - daily The purpose of spill and overfill protection equipment is to minimize the potential for a release during _____. - fuel deliveries Which of the following is a potential symptom of toxic petroleum exposure? a. dizziness b. tremors c. eye irritation d. all the above - d. all the above Under-dispenser containment is required for _____ underground storage tank systems. - all All of the following are true for Automatic Tank Gauging except for... a. ATG system consists of a probe installed in a tank b. ATG systems are required to be installed in all UST systems c. ATG systems have a control panel that can provide information on product level and temperatured. ATG systems can be programmed to calculate the changes in product volume to determine if a tank is leaking - b. ATG systems are required to be installed in all UST systems According to CCR Title 23, UST regulations, spill containment must meet all of the following requirements except: a. be installed on vent risers b. have a minimum capacity of 5 gallons c. collect any hazardous substance d. be equipped with a a drain valve or other means to keep the spill container empty - a. be installed on vent risers
Información del documento
- Subido en
- 6 de enero de 2024
- Número de páginas
- 10
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas