WA UST Site Assessor Exam Questions And Answers Rated A+ New Update Assured Satisfaction
What is the hold time for soil and preserved GW GRO samples? - 14 days Is an ICC certification needed to install an AST? - No Flammability limits of gasoline - 1.4 to 7.6% How many days do you have from a tank closure to report/provide the UST checklist to ECY? - 30 days MTCA Method A lead CUL, soil - 250 mg/kg MTCA Method A lead CUL, GW - 15 ug/L Is the vadose zone saturated or unsaturated? - Unsaturated List in order of most mobile to least mobile: Bunker C, heating oil, diesel, gasoline - Gasoline, diesel, heating oil, Bunker C Is oxygenated gasoline more or less likely to dissolve in water? - More likely; fuel additives like MTBE are more soluble than gasoline Where to sample on dispenser? - 2 feet below where the piping enters the UST Where to sample along piping? - Every 50 linear feet and along joints/elbows How many GW samples are needed after decommissioning if a release to GW is confirmed, and where relative to the tank? - 3; 1 upgradient, 2 downgradient What vapor is an FID used to measure? - MethaneWhat is a PID measuring? - Mixture of all volatiles What conditions might impede a PID? - Moisture/humidity, dust, transformers, power lines What UST capacity does not require a site assessment at closure? - Less than 110 gallons Purpose of a site check -To investigate a UST site for the presence of a release when evidence indicated that a release may have occurred Purpose of a site assessment - To investigate a UST site at the time of closure or change-inservice to determine if a release has occurred Site check vs. site assessment - A site check is an investigation of a UST site for a release when evidence indicates that one many have occurred; a site assessment determines if a release has occurred
Información del documento
- Subido en
- 6 de enero de 2024
- Número de páginas
- 7
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas