On a steel tank without cathodic protection, if a coating is flawed, what happens at the flaw? a. Cathodic surface is increased b. Current flow is increased from this area c. Current flow is increased to this area - correct answers b. Current flow is increased from this area On an impressed current cathodic protection system, the negative wire of the rectifier is connected to the: a. Anode b. Cathode c. Drop tube d. Dielectric union - correct answers b. Cathode All are examples of acceptable release detection for tanks, except: a. Impressed current cathodic protectionb. Automatic tank gauging c. Statistical inventory reconciliation d. Soil-vapor monitoring - correct answers a. Impressed current cathodic protection When a tank is temporarily closed, the cathodic protection system: a. Must be turned off b. Must remain in operation c. Should be removed d. Operator can have it on or off. - correct answers b. Must remain in operation When a steel tank is installed with a galvanic CP system attached, the tank gauges are usually connected through a riser with a dielectric bushing. What is the purpose of that? a. To prevent static discharge b. To minimize effects of noise c. To electrically isolate the tank from the tank gauged. To prevent water intrusion in the tank - correct answers c. To electrically isolate the tank from the tank gauge Factory-installed diectric coatings may include all of the following except: a . Asphalt b. epoxies c. Enamels d. fiberglass-reinforced plastic - correct answers a . Asphalt According to the EPA, Tank tightness test data must be maintained for: a. 18 months b. 3 years c. 5 years d. Until the next test is performed - correct answers d. Until the next test is performed How long must records of UST system repairs be av

Mostrar más Leer menos
Institución
U3 ICC Tank Tightness
Grado
U3 ICC Tank Tightness










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
U3 ICC Tank Tightness
Grado
U3 ICC Tank Tightness

Información del documento

Subido en
6 de enero de 2024
Número de páginas
21
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

U3 ICC Tank Tightness Testing Exam Questions and Answers (Latest Update 2023) Verified Answers On a steel tank without cathodic protection, if a coating is flawed, what happens at the flaw? a. Cathodic surface is increased b. Current flow is increased from this area c. Current flow is increased to this area - correct answers ✅b. Current flow is increased from this area On an impressed current cathodic protection system, the negative wire of the rectifier is connected to the: a. Anode b. Cathode c. Drop tube d. Dielectric union - correct answers ✅b. Cathode All are examples of acceptable release detection for tanks, except: a. Impressed current cathodic protection b. Automatic tank gauging c. Statistical inventory reconciliation d. Soil -vapor monitoring - correct answers ✅a. Impressed current cathodic protection When a tank is temporarily closed, the cathodic protection system: a. Must be turned off b. Must remain in operation c. Should be removed d. Operator can have it on or off. - correct answers ✅b. Must remain in operation When a steel tank is installed with a galvanic CP system attached, the tank gauges are usually connected through a riser with a dielectric bushing. What is the purpose of that? a. To prevent static discharge b. To minimize effects of noise c. To electrically isolate the tank from the tank gauge d. To pre vent water intrusion in the tank - correct answers ✅c. To electrically isolate the tank from the tank gauge Factory -installed diectric coatings may include all of the following except: a . Asphalt b. epoxies c. Enamels d. fiberglass -reinforced plastic - correct answers ✅a . Asphalt According to the EPA, Tank tightness test data must be maintained for: a. 18 months b. 3 years c. 5 years d. Until the next test is performed - correct answers ✅d. Until the next test is performed How long must records of UST system repairs be available on site? a. 60 days

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
UNLIMITEDPAPERS WGU
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
356
Miembro desde
3 año
Número de seguidores
295
Documentos
6546
Última venta
3 días hace

3.4

24 reseñas

5
9
4
2
3
7
2
1
1
5

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes