SAFe SPC Section 5 - Releasing on Demand with DevOps 100% Correct
ART Sync - ANSWER coordinates progress during PI via Scrum of Scrums and PO Sync Scrum of Scrums - ANSWER Visibility in progress and impediments Facilitated by RTE Participants: SMs, selected team members, SMEs as needed Weekly or more - 30 - 60 minutes timeboxed and followed by meet after PO Sync - ANSWER Visibility into progress, scope, priority adjustments facilitated by RTE or PM Participants: PMs, PO, stakeholders and SMEs as needed weekly or more, 30 - 60 minutes timeboxed and followed by meet after DevOps in the value stream - ANSWER Value occurs only when the end users are operating the solution CALMR approach to DevOps - ANSWER "C"ulture of shared responsibility "A"utomation of CD pipeline "L"ean flow - small batch, limited WIP, visibility "M"easure the flow - use application telemetry "R"ecovery - architect and enable low risk releases Continuous Exploration - ANSWER Hypothesize Collaborate and Research Architect Synthesize Features - ANSWER have benefit hypothesis and acceptance criteria fit in 1 PI Functional and NonFunctional Requirements Epics - ANSWER have big hypothesis and can span PIs may contain multiple features
Escuela, estudio y materia
- Institución
- SAFe SPC
- Grado
- SAFe SPC
Información del documento
- Subido en
- 6 de enero de 2024
- Número de páginas
- 2
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
safe spc section 5 releasing on demand with devo
-
safe spc section 5 stuvia 2023
-
art sync answer coordinates progress during pi
Documento también disponible en un lote