Water Distribution - Additional Sample Questions and Answers with Certified Solutions
A 6-in. pipeline needs to be flushed. If the desired length of pipeline to be flushed is 316 ft, how many minutes will it take to flush the line at 31 gpm? a. 10 minutes b. 15 minutes c. 30 minutes d. 60 minutes Answer: b. 15 minutes What is the area of a trench that is 22.4 ft long and 3.3 ft wide? a. 26 sq ft b. 74 sq ft c. 143 sq ft d. 187 sq ft Answer: b. 74 sq f
Escuela, estudio y materia
- Institución
- Water Distribution
- Grado
- Water Distribution
Información del documento
- Subido en
- 2 de enero de 2024
- Número de páginas
- 42
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
water distribution additional sample questions
Documento también disponible en un lote