NERC RC Test with Complete Solution
System studies identify what -Answer Predict operations and identify constraints If ACE remains the same and frequency goes up what has happened? -Answer Someone lost load When a generator has its AVR in service it is a? -Answer Dynamic source of reactive power Black start resource testing is done every? -Answer 3 years Each BA shall operate its AGC on? -Answer Tie line Frequency Bias When is voltage reduction reportable? -Answer Greater than 3% Reactors do what? -Answer Absorb VARs What AGC mode should a generator use when islanded? -Answer Flat Frequency Implement back up functionality plan within? -Answer 2 hours Who submits the request for interchange for an emergency transaction? -Answer The sink BA Transmission lines that are heavily loaded do what? -Answer Absorb VARs
Geschreven voor
- Instelling
- NERC RC
- Vak
- NERC RC
Documentinformatie
- Geüpload op
- 29 december 2023
- Aantal pagina's
- 6
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
nerc rc test with complete solution
Ook beschikbaar in voordeelbundel