100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

IRC Building Code Questions and Answers Already Passed

Puntuación
-
Vendido
-
Páginas
47
Grado
A+
Subido en
22-12-2023
Escrito en
2023/2024

IRC Building Code Questions and Answers Already Passed In Seismic Design Categories D0, D1, and D2, _____ stone masonry walls shall not be used. Rubble R404.1.1.1 Masonry foundation walls. In Seismic Design Categories Do, D1 and D2, foundations with stem walls shall be provided with a minimum of one No. ___ bar within 12 inches of the top of the wall and one No. ___ bar located 3 to 4 inches from the bottom of the footing. #4 #4 R403.1.3.1 Foundations with stemwalls The grade away from foundation walls shall fall a minimum of ___ inches within the first ____ feet. 6 in. 10 ft. (Read exception) R401.3 Drainage In flood hazard areas, enclosed areas below the design flood elevation shall be used sole for: 1._____ 2._____ 3._____ Parking of vehicles Building access or Storage R322.3.5 Enclosed areas below design flood elevation. Address number shall be a minimum of ___ inches high with a minimum stroke of ____inch. 4 in. 1/2 in. R319.1 Address numbers Protection of wood and wood based products from ___ shall be provided by the use of naturally durable wood or wood that is preservative treated. Decay R317.1 Location required Dwelling Units in two-family dwellings shall be separated from each other by wall and/or floor assemblies having not less than ___-hour fire resistive rating. 1 hour R302.3 Two family dwellings In areas where the probability of termite infestation is "very heavy", the clearance between foam plastics installed above grade and exposed earth shall be at least ____ inches. 6 in. R318.4 Foam plastic protection A thermal barrier is not required for foam plastic insulation in an attic that is entered only for purposes of ____ or ____. Repairs or maintenance R316.5.3 Attics Foam plastic shall be separated from the interior of a building by an approved ____ ____ of minimum ____- inch gypsum wallboard. Thermal barrier 1/2 in. R316.4 Thermal barrier All exterior footings shall be placed at least ___ inches below the undisturbed ground surface. 12 in. (Where applicable, the dept of footings shall also conform to R403.1.4.1 - R403.1.4.2) R403.1.4 Minimum length The top surface of footings shall be level. The bottom surface of footings shall not have a slope exceeding ____ unit vertical in ____ units horizontal. 1:10 R403.1.5 Slope Wood sill plates shall be anchored to the foundation with anchor bolts spaced a maximum of ____ feet on center. 6 ft. R403.1.6 Foundation anchorage Foundation anchor bolts shall be at least ___ inch in diameter and shall extend a minimum of ___ inches into the concrete or grouted cells of concrete masonry units. 1/2 in. 7 in. R403.1.6 Foundation

Mostrar más Leer menos
Institución
IRC Building Code
Grado
IRC Building Code











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
IRC Building Code
Grado
IRC Building Code

Información del documento

Subido en
22 de diciembre de 2023
Número de páginas
47
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

IRC Building Code Questions and Answers Already Passed In Seismic Design Categories D0, D1, and D2, _____ stone masonry walls shall not be used. ✔✔Rubble R404.1.1.1 Masonry foundation walls. In Seismic Design Categories Do, D1 and D2, foundations with stem walls shall be provided with a minimum of one No. ___ bar within 12 inches of the top of the wall and one No. ___ bar located 3 to 4 inches from the bottom of the footing. ✔✔#4 #4 R403.1.3. 1 Foundations with stemwalls The grade away from foundation walls shall fall a minimum of ___ inches within the first ____ feet. ✔✔6 in. 10 ft. (Read exception) R401.3 Drainage In flood hazard areas, enclosed areas below the design flood elevation shall be used sole for: 1._____ 2._____ 3._____ ✔✔Parking of vehicles Building access or Storage R322.3.5 Enclosed areas below design flood elevation. Address number shall be a minimum of ___ inches high with a minimum stroke of ____inch. ✔✔4 in. 1/2 in. R319.1 Address numbers Protection of wood and wood based products from ___ shall be provided by the use of naturally durable wood or wood that is preservative treated. ✔✔Decay R317.1 Location required Dwelling Units in two -family dwellings shall be sepa rated from each other by wall and/or floor assemblies having not less than ___ -hour fire resistive rating. ✔✔1 hour R302.3 Two family dwellings In areas where the probability of termite infestation is "very heavy", the clearance between foam plastics ins talled above grade and exposed earth shall be at least ____ inches. ✔✔6 in. R318.4 Foam plastic protection A thermal barrier is not required for foam plastic insulation in an attic that is entered only for purposes of ____ or ____. ✔✔Repairs or maintenan ce R316.5.3 Attics Foam plastic shall be separated from the interior of a building by an approved ____ ____ of minimum ____ - inch gypsum wallboard. ✔✔Thermal barrier 1/2 in. R316.4 Thermal barrier All exterior footings shall be placed at least ___ inch es below the undisturbed ground surface. ✔✔12 in. (Where applicable, the dept of footings shall also conform to R403.1.4.1 - R403.1.4.2) R403.1.4 Minimum length The top surface of footings shall be level. The bottom surface of footings shall not have a s lope exceeding ____ unit vertical in ____ units horizontal. ✔✔1:10 R403.1.5 Slope Wood sill plates shall be anchored to the foundation with anchor bolts spaced a maximum of ____ feet on center. ✔✔6 ft.

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
StellarScores Western Governers University
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
1900
Miembro desde
2 año
Número de seguidores
864
Documentos
21000
Última venta
16 horas hace
Your Academic Hub: Documents, Study Guides, Summaries, Essays, and Exclusive Package Deals.

Welcome to my comprehensive academic resource store! At my online hub, I offer a vast array of meticulously crafted documents, study guides, summaries, and essays to support your educational journey. I understand the value of accuracy and completeness, which is why all my materials are verified and kept up-to-date with the latest versions. But that's not all! I also offer exclusive package deals and bundles to provide you with cost-effective solutions for your academic needs. Whether you're a student looking for study aids or seeking in-depth knowledge, my store is your one-stop destination for reliable, top-quality materials that can propel your learning experience to new heights. Explore my offerings and unlock the keys to academic success today!

Lee mas Leer menos
4.0

434 reseñas

5
234
4
78
3
60
2
24
1
38

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes