100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

IRC 2018 Latest Update with Verified Solutions

Puntuación
-
Vendido
-
Páginas
30
Grado
A+
Subido en
22-12-2023
Escrito en
2023/2024

IRC 2018 Latest Update with Verified Solutions The purpose of this code is to establish _________ requirements to safeguard the public safety, health and general welfare. minimum 2018 IRC Section R101.3 Intent. Where, in any specific case, different sections of this code specify different materials, methods of construction or other requirements, the most _________ shall govern. restrictive 2018 IRC Section R102.1 General. Where a referenced code or standard includes subject matter that is within the scope of the IRC, the provisions of the _________ shall take precedence. IRC 2018 IRC Section R102.4.2 Provisions in referenced codes and standards. An alternative material or method shall be approved where the proposed design is _________ and complies with the _________ of the code. satisfactory intent 2018 IRC Section R104.11 Alternative materials, design and methods of construction and equipment. Copyright Compliance with the specific _________ -based provisions of the International Codes in lieu of specific requirements of the IRC shall be permitted as an alternative. performance 2018 IRC Section R104.11 Alternative materials, design and methods of construction and equipment. A permit is not required for one-story detached accessory structures, provided that the floor area does not exceed _________ square feet. 200 2018 IRC Section R105.2 Work exempt from permit, Building: Item 1. Fences that are _________ feet or less in height do not require permits. 7 2018 IRC Section R105.2 Work exempt from permit, Building: Item 2. A permit is not required for the replacement of branch circuit overcurrent devices (breakers) of the required capacity in the same location (within a panel). True 2018 IRC Section R105.2 Work exempt from permit, Electrical: Item 3. Unattached decks not exceeding _________ square feet in area, that are not more than _________ inches above grade, do not require a permit. IRC Section R105.2 Work exempt from permit, Building: Item 10. Where equipment replacements and repairs must be performed in an emergency situation, the permit application shall be submitted within the _________ _________ business day. next working ...to the building official. 2018 IRC Section R105.2.1 Emergency repairs. An application for a permit for any proposed work shall be deemed to have been abandoned _________ days after the date of filing. 180 180 days also applies to extensions. 2018 IRC Section R105.3.2 Time limitation of application. Before issuing a permit, the building official is _________ to examine or cause to be examined buildings, structures and sites for which an application has been filed. authorized 2018 IRC Section R105.9 Preliminary inspection. Where the building official issues a permit, the construction documents shall be approved in writing or by a stamp which states _________ _________ _________ _________ . REVIEWED FOR CODE COMPLIANCE 2018 IRC Section R106.3.1 Approval of construction documents. Final inspection shall be made after the permitted work is _________ and prior to _________ . complete occupancy 2018 IRC Section R109.1.6 Final inspection. If located in a flood hazard area, the documentation of elevations required in Section R322.1.10 shall be submitted to the building official prior to the _________ inspection. final 2018 IRC Section R109.1.6.1 Elevation documentation. Signifies access that requires the removal of an access panel or similar removable obstruction. Access (to) Ready Access (to) signifies access without the necessity for removing a panel or similar obstruction 2018 IRC Section R202 Definitions. A finished or unfinished habitable space within an attic. Attic, Habitable Other conditions relating to occupiable floor area must also be met. 2018 IRC Section R202 Definitions. Hot water is water at a temperature greater than or equal to _________ °F. 110 2018 IRC Section R202 Definitions (Definition of HOT WATER). A wall supporting any vertical load in addition to its own weight is a _________ - _________ wall. load-bearing 2018 IRC Section R202 Definitions (Definition of WALLS, Loadbearing wall). What is the minimum uniformly distributed live load for habitable attics and attics served with fixed stairs? 30 pounds per square foot Review of tables will be useful as knowledge of many tables is necessary for the exam. 2018 IRC Table R301.5 Minimum Uniformly Distributed Live Loads. Wood structural panels with a minimum thickness of _________ inch and a maximum span of _________ feet shall be permitted for opening protection in windborne debris regions. 7/16 8 2018 IRC Section R301.2.1.2 Protection of openings, Exception. The seismic provisions of the IRC apply to detached one- and two-family dwellings in Seismic Design Categories _________ . D0, D1

Mostrar más Leer menos
Institución
IRC 2018
Grado
IRC 2018










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
IRC 2018
Grado
IRC 2018

Información del documento

Subido en
22 de diciembre de 2023
Número de páginas
30
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
StellarScores Western Governers University
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
1901
Miembro desde
2 año
Número de seguidores
864
Documentos
21000
Última venta
1 día hace
Your Academic Hub: Documents, Study Guides, Summaries, Essays, and Exclusive Package Deals.

Welcome to my comprehensive academic resource store! At my online hub, I offer a vast array of meticulously crafted documents, study guides, summaries, and essays to support your educational journey. I understand the value of accuracy and completeness, which is why all my materials are verified and kept up-to-date with the latest versions. But that's not all! I also offer exclusive package deals and bundles to provide you with cost-effective solutions for your academic needs. Whether you're a student looking for study aids or seeking in-depth knowledge, my store is your one-stop destination for reliable, top-quality materials that can propel your learning experience to new heights. Explore my offerings and unlock the keys to academic success today!

Lee mas Leer menos
4.0

438 reseñas

5
237
4
78
3
61
2
24
1
38

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes