100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

LARE Section 1: Project & Construction Management

Puntuación
-
Vendido
-
Páginas
43
Grado
A+
Subido en
17-12-2023
Escrito en
2023/2024

LARE Section 1: Project & Construction Management Pre-Project Management - ANS ️️ (10%) The designer pursues a particular project for a client. Through discussions about the desired final product, a scope of services and deliverables are arrived at. The designer prepares a design proposal which if agreed to becomes a contract between the client and the designer. Thus the project begins. Project Management - ANS ️️ (30%) Relating to the LARE, project management begins with determining the project scope and assembling an appropriate design team, going through the design process while communicating progress with the client and completing "permittable documents that protect the health, safety and welfare of the public. These documents have been prepared so that the project can be constructed within an established budget Whether this is the case or not will be tested during the bidding process. Bidding - ANS ️️ (20%) Combining the design documents with other bid and contract documents, the project is then reviewed by prospective contractors who decide whether they wish to provide a bid. The designer plays a particular role in the bidding process, answering questions that arise during the bid process, assisting the owner in choosing a contractor by assessing the bids and possibly investigating bidder qualifications. Construction - ANS ️️ (30%) Like in bidding, the designer plays a particular role during construction. Usually not related to the physical execution of the design documents, but participating in meetings with the owner and contractor, providing clarifications to documentation questions, reviewing construction progress that the installation is proceeding as designed and providing substantial completion and punch list services once the contractor declares the completion of construction. Maintenance - ANS ️️ (10%) The designer's participation in the project may not end with construction. At times, the designer may be asked to prepare maintenance and operation manuals, prepare a management plan and review maintenance services. Components of Pre-Project Management (7) - ANS ️️ -Preparation of or response to a Request for Qualification (RFQ) or Request for Proposal (RFP) -Determine project scope and client requirements -Develop design program -Establish Scope of Services and required outside expertise (selecting a team of project consultants) -Establish project budget -Prepare and negotiate contractual agreements with the client -Establish project schedule Client - ANS ️️ A person usin

Mostrar más Leer menos
Institución
Lymphedema
Grado
Lymphedema











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Lymphedema
Grado
Lymphedema

Información del documento

Subido en
17 de diciembre de 2023
Número de páginas
43
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
KatelynWhitman West Virginia University
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
1100
Miembro desde
2 año
Número de seguidores
483
Documentos
34017
Última venta
2 días hace
Golden Quill Emporium Store

Get Yourself Well-Researched Study Materials to Ace Your Online& Actual Exam Tests with Confidence. STUDY LIKE A PRO WITH A WELL FORMATTED Q&A MATERIALS.

3.6

239 reseñas

5
95
4
39
3
54
2
20
1
31

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes