PJM Generation Dispatcher Sample Exam | Questions with 100% Correct Answers | Verified | Latest Update 2024
Real time transmission constraints or contingencies may be alleviated with generators operating : A. below 60 hertz B. on a new price curve C. on a new cost curve D. off cost ( out of merit) - D. off cost ( out of merit ) Monitoring LMP may give insights into : A. system constraints B. system voltage C. system frefuency D. time error - A. system constraints PJM calls for which of the following to recover the ACE so that tie line schedules are maintained ? A. IRC ( instantaneous reserve check ) B. synchronized Reserves C. supplemential reserves D. minimun generation calculation - B. synchronized Reserves
Escuela, estudio y materia
- Institución
- PJM Generation Dispatcher
- Grado
- PJM Generation Dispatcher
Información del documento
- Subido en
- 13 de diciembre de 2023
- Número de páginas
- 10
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
pjm generation dispatcher sample exam questions
Documento también disponible en un lote