Risk Management Basic (Military) 100% verified
What do the terms "catastrophic, critical, moderate, and negligible" describe in the risk assessment matrix? correct answers Level of severity of an adverse event's effect What is the first step in the risk management (RM) process? correct answers Identify hazards How are hazards identified during mission planning? correct answers By applying the METT-TC framework to examine risks posed by the mission, enemy, terrain and weather, troops and equipment, time, and civil considerations Which of the following is not a RM principle? correct answers Apply the RM process to situations where serious injury might occur You are part of a combat patrol in a foreign city. There are squad-sized insurgent forces operating in the area. What are key considerations when identifying hazards associated with the Civil Considerations factor of METT-TC? correct answers Pedestrians at the market, riots or demonstrations, and/or religious events taking place What METT-TC factor is at the root of the question: Do I remember the training I received about what to do when encountering unexploded ordnance? correct answers Troops and Equipment What step in the risk management (RM) process is focused on determining the probability and severity of a hazard occurring? correct answers Assess hazards What is the intersection of the assessed probability and severity of a hazard called in the RM process? correct answers Risk level What is risk management (RM)? correct answers A decision-making process for identifying hazards and controlling risks both on-duty and off-duty What do of the terms "frequent, likely, occasional, seldom, and unlikely" describe in the risk assessment matrix? correct answers Level of probability of an adverse event occurring What is the purpose of the RM step, Develop Controls and Make Risk Decisions? correct answers To determine whether the risk of an adverse event occurring is reduced enough that the benefits of completing the mission outweigh the risks What does "residual risk" mean in the RM process? correct answers Risk that remains after all controls have been selected What RM process step requires a cycle of continuous reassessment until the benefits of completing the mission outweigh the risks of not completing it? correct answers Develop controls and make risk decisions
Información del documento
- Subido en
- 4 de diciembre de 2023
- Número de páginas
- 2
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas