100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

Crane questions with 100% correct answers graded A= 2023/2024

Puntuación
-
Vendido
-
Páginas
7
Grado
A+
Subido en
01-12-2023
Escrito en
2023/2024

Which of the following OSHA regulations govern suspended personnel platforms? - correct answer OSHA According to ASME B30.3, the prohibited zone for power lines that are 60 kV is? - correct answer 15 ft. According to ASME B30.3, load hoist rotation resistant wire rope has a design factor of: - correct answer 5 to 1 According to ASME B30.3, when lifting a suspended personnel platform the design factor for the rigging hardware is: - correct answer 5 to 1 According to ASME B30.3, load hoist ropes that are not rotation resistant must have a design factor of: - correct answer 5 to 1 The OSHA Construction Standard for rigging equipment is: - correct answer 1926.251 When using cable or nylon spreaders it is important to remember: - correct answer The lower the spreader angle the greater the tension According to ASME B30.3, on whose recommendations should a preventative maintenance program be set up? - correct answer Crane manufacturer According to OSHA, when testing a man basket how long must the test pick be maintained? - correct answer 5 minutes According to ASME B30.3, what is the minimum pitch diameter for load hoisting sheaves? - correct answer Not less than 18 times rope diameter According to ASME B30.3, what is the minimum pitch diameter for load block sheaves? - correct answer Not less than 16 times rope diameter According to ASME B30.3, what is the minimum pitch diameter for boom hoist sheaves? - correct answer Not less than 18 times rope diameter According to OSHA, when lifting personnel the cranes hook must be the type that: - correct answer Can be closed and locked According to OSHA, when working over water with a man basket are the people inside required to wear a belt/harness? - correct answer No harness or belt required According to ASME B30.3, when working near power lines where should caution stickers be installed? - correct answer At operators station and at the base of the crane According to OSHA, a frequent inspection is: - correct answer Daily to monthly According to OSHA, a periodic inspection is: - correct answer Monthly to annually Cranes idle for more than 6 months must have inspections performed: - correct answer Frequent and periodic Crane idle for less than 6 months must have inspections performed: - correct answer Frequent Cranes lifting personnel platforms must have platform and rigging inspected: - correct answer Prior to each shift Crane hooks must not be twisted in excess of: - correct answer 10 degrees A crane hook's throat open must not exceed: - correct answer 15% of its original size By order of hitch strength, which is the correct answer? - correct answer Basket, vertical, choker According to ASME B30.3, and OSHA, you should always have at least how many wraps on a hoist drum? - correct answer 2 What is the minimum allowable distance from the crane and power lines under 50kV? - correct answer 10ft. According to ASME B30.3, how many randomly broken wires must there be to remove a running wire rope from service? - correct answer 12 According to ASME B30.3, when working near power lines when is a signal person required? - correct answer When crane moves within a booms length of power lines According to OSHA, after the crane has been checked out and before personnel lift operations begin the crew should: - correct answer Have a pre-lift meeting According to OSHA, when is it safe to work closer than the allowable distance from power lines? - correct answer When utility company says lines are de-energized When should a tagline be used? - correct answer When rotation of load would be dangerous What is the minimum design factor required for a boom hoist rope? - correct answer 3.5 How many broken wires must be present in one strand of one lay for running wire rope to be removed from service? - correct answer 4 What is the maximum permitted wind speed when climbing a tower crane? - correct answer 20 mph According to ASME B30.3, a crane should be plumbed to: - correct answer 1 to 500

Mostrar más Leer menos
Institución
Crane Safety
Grado
Crane Safety









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Crane Safety
Grado
Crane Safety

Información del documento

Subido en
1 de diciembre de 2023
Número de páginas
7
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
BravelRadon Havard School
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
875
Miembro desde
4 año
Número de seguidores
540
Documentos
42128
Última venta
6 días hace
EXAM HUB

Welcome to Exam Hub Are you looking for high-quality, exam-ready notes, past papers, Test Banks, and well-researched study materials to boost your grades? You’re in the right place! I create and upload detailed, easy-to-understand, and well-structured documents across multiple subjects. All my materials are designed to help you study , save time, and excel in your coursework and exams! On this page NURSING EXAMS,STUDY GUIDES,TESTBANKS AND QUALITY EXAMS IS THE KEY TO STUDENTS CAREER EXCELLENCE, you find all documents, package deals, and flashcards offered by BravelRadon (EXAM HUB STORES!)....kindly recommend a friend for A+ GARANTEEd either you are a first-year student or final-year graduation! best of luck!

Lee mas Leer menos
3.5

154 reseñas

5
56
4
30
3
32
2
8
1
28

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes