IICRC WRT TesT (110 seTs) 2023| gRaded a+
IICRC WRT TesT (110 seTs) 2023| gRaded a+ #1. During the inspection process, restorers shall make a reasonable effort to - ANSWER C. identify and address potential safety hazards #2. A significant amount of water absorption and evaporation load where wet porous materials represent ~5% to ~40% of combined ceiling, walls, and flooring surface areas and where low evaporation materials and assemblies are minimally wet is - ANSWER B. class 2 #3. Multiple extraction of salvageable materials, especially porous material (e.g. Carpet , cushion) often are required to: - ANSWER decrease drying time #4. To enhance drying, restorers should manage both ambient temperature and - ANSWER surface temperatures of affected materials #5. Water damage restoration services should not begin until after the: - ANSWER restorer has entered into an adequately written contract. #6. Two tools that should be used to properly disengage most stretched-in carpet - ANSWER Knee kicker and carpet awl #7. When inspecting a water damage structure, restorers should inspect: - ANSWER all potentially affected areas. #8. Buckled or damaged particle board should - ANSWER removed and replaced with new material. #9. upon entering a building, professional moisture detection equipment should be used to evaluate and document: - ANSWER applicable psychrometric conditions and moisture content or level readings
Información del documento
- Subido en
- 12 de noviembre de 2023
- Número de páginas
- 13
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas