100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

Construction Management Final Exam Latest Update (2023/2024) Graded A

Puntuación
-
Vendido
2
Páginas
27
Grado
A+
Subido en
02-10-2023
Escrito en
2023/2024

Construction Management Final Exam Latest Update (2023/2024) Graded A Why are the MSDS so important for workers to read at the job site? Material Safety Data Sheet provide important knowledge on how to work with toxic materials at the job site. Quality assurance includes all of the following practices EXCEPT: Testing standards Which of the following is NOT an item of personal protective equipment that might be used by workers on the jobsite? Hardhat, Gloves Which of the following is NOT a type of personal protection equipment? Skin Protection Which of the following does NOT describe preparatory inspections? Preparatory inspections are never done by personnel employed by the contractor Which of the following are primary cause of injuries in the construction industry? Slips Trips and Falls, Being crushed or trapped, Electrical shocks Which of the following are primary component of an effective safety management plan? Substance abuse, Hazardous material communications, Personal protection Which Federal agency is responsible for establishing safety standards and enforcing them through inspections conducted at construction jobsites? OSHA Which quality control mechanism are mandated by the construction contract and used to check for conformance to the plans and specifications? submittals, mock ups, shop drawings Which of the following shows the general relationship between the level of quality and cost? when quality increases, cost increases All of the following are fundamental objectives of a quality management plan: Do things right the first time, Prevent things from going wrong, Continually improve the process What is an FOR? A report used to track questionable quality and safety performance on the jobsite Which of the following is a difference between quality control and quality assurance? Quality control happens at the project level while quality assurance happens at the process level The name of the testing agency for construction in the United States is: ASTM What is not the concept behind a zero-punch list? Complete the final walk-through with as many of the punch items noted on the list, To have no change orders on the project, Please every expectation of the owner What is the cost code chart usually made up of? activity, code, project number What is the riskiest element of the project control and project planning? estimating productivity Periodic predictions stated in reports as to the final cost and schedule outcomes on a project while the work is still going on are known as: forecasts What is an example of a factor that can impact project performance? Defective Material, Hurricane in your project area, Overcrowded Job sites What is NOT an escalation clause? It is a clause that covers when the truck can deliver building materials, It is the same thing as a contingency and tries to account for unforeseen conditions, It is a clause that covers risks associated with underground utilities, grading, and excavation What is the essential(s) of an effective project control system? Quality Information , Good Reporting system What does it mean to crash the schedule? To compress the overall schedule by accelerating certain activities within it so that they finish sooner What does it mean to forecast in project management? To predict the final cost and schedule outcomes on a project while the work is still in progress What are the three primary tracking elements when monitoring project performance? Quality, Cost, and Time What is not one of the fundamental steps that is included in the project control cycle? update technology The cost or time difference between the actual project performance and the planned project performance is the definition of what? variance What is NOT an example of a source where you might gather field information needed to develop your project controls? requests for information All of the following are TRUE regarding project activities

Mostrar más Leer menos
Institución
Construction Management
Grado
Construction Management










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Construction Management
Grado
Construction Management

Información del documento

Subido en
2 de octubre de 2023
Número de páginas
27
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
StellarScores Western Governers University
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
1907
Miembro desde
2 año
Número de seguidores
864
Documentos
21100
Última venta
1 día hace
Your Academic Hub: Documents, Study Guides, Summaries, Essays, and Exclusive Package Deals.

Welcome to my comprehensive academic resource store! At my online hub, I offer a vast array of meticulously crafted documents, study guides, summaries, and essays to support your educational journey. I understand the value of accuracy and completeness, which is why all my materials are verified and kept up-to-date with the latest versions. But that's not all! I also offer exclusive package deals and bundles to provide you with cost-effective solutions for your academic needs. Whether you're a student looking for study aids or seeking in-depth knowledge, my store is your one-stop destination for reliable, top-quality materials that can propel your learning experience to new heights. Explore my offerings and unlock the keys to academic success today!

Lee mas Leer menos
4.0

439 reseñas

5
238
4
78
3
61
2
24
1
38

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes