Cppb 2023 Test - Domain Iv - Answered 100% Correct
PERFORMANCE ASSESSMENT PLAN (PAP) - ANSWER-Ensure supplier compliance to specifications is the development of PAP. Based on contract performance requirements Privity of contract - ANSWER-deals with parties to a contract having the right to enforce it PRE-SOURCING (SPECIFICATION SCOPE STAGE) - ANSWER-1) Site visit to determine pre-existing conditions 2) Samples 3) Equipment Demonstrations 4) Proponents meeting DURING SOURCING (EVALUATION STAGE) - ANSWER-1) FORMAL PRESENTATION 2) Technical Testing 3) Work-in-progress inspection 4) Plant AD-HOC (unannounced) visits 5) Trials and testing POST AWARD (IMPLEMENTATION STAGE) - ANSWER-1) Product Samples 2) Testing 3) Quality 4) Laboratory testing STATISTICAL PROCESS CONTROL (SPC) - ANSWER-Key building block in implementing a strategy of continuous product or service improvement focus on quality management in today's government environment ELEMENTS OF A CONTRACT - ANSWER-1- Offer 2- Acceptance 3- Defineteness (specificity required) 4- Legal consideration (exchange between parties) 5- Mutuality of Obligation (all parties obligated) 6- Competent Parties 7- Legal Purpose (Agreement allows under law) EXPRESS CONTRACT - ANSWER-1) May be written or oral 2) Formal elements exist 3) T's and C's are considered express. Includes everything the parties deemed important IMPLIED-IN-FACT CONTRACT - ANSWER-occurs when some of the formal contractual elements occur through a person's conduct rather than being explicitly stated in words CONTRACT INTERPRETATION - ANSWER-Courts will refer to the written contract in the event of dispute Interpretation of T's and C's - Common Law Protocols - Accepted practices regarding to business protocols CARDINAL RULE - ANSWER-Focus on plain language of the contract CONTRACT ADMINISTRATION - ANSWER-Management actions that must be taken following the award of a contract to assure full compliance with all of terms and conditions contained within the contract document. SECONDARY RULES - ANSWER-Whole instrument rule and the express language rule. Priority to the meaning of the overall contract as opposed to a section or clause of the contract. MECHANICAL RULES - ANSWER-Handwritten notes taking precedence over printed text, quantities EXCUSABLE DELAYS - ANSWER-Provides the contractor with protection from sanctions for late performance, such as default termination, liquidated damages, actual damages, excess costs due to delays and Force Majeure FORCE MAJEURE - ANSWER-unforeseeable circumstances that prevent someone from fulfilling a contract including those cause by nature that can impact the contract price, terms and conditions NON-EXCUSABLE DELAYS - ANSWER-1- Financial Difficulties 2- Lack of materials 3- Labor problems, excluding strikes 4- Lack of equipment 5- Lack of knowledge 6- Reasonable delays preceding the award COMPENSABLE DELAYS - ANSWER-1) Ordered Suspensions - If public agency orders a "Suspension of Work" clause 2) Constructive Suspension - Public agency is found to be responsible for the work stoppage REMEDIES FOR DEFECT IN NON-CONFORMING PRODUCTS OR SERVICES - ANSWER-1) Require contractor to correct the defect
Información del documento
- Subido en
- 18 de septiembre de 2023
- Número de páginas
- 6
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas