CESSWI Part 2 Questions With Complete Solution
Existing Veg, Desc/Purp correct answer: temp or perm bmp desi to stab soil and remove sups part from sheet flow runoff. Existing Veg, Objectives correct answer: 1) Site Plan and Mang 2) Erosi Cont 3) Sedi Cont 4) Post-Cons Mang Existing Veg, applic correct answer: 1) Areas within site where no const activity is occur 2) Areas where local, state and fed govt require preservation 3) Areas where existing veg can be utilized for eros, sedi, and storm water quality. Existing veg: inspection correct answer: 1) Accord to regu timetables 2) erosi and damage veg 3) sufficient moisture to ensure growth 4) veg is well stab 5) adequate cover 6) debris and litter 7) invasive exotics Existing veg: maint correct answer: 1) only disturb area for construct 2)irrigate dry seasons 3) remove see, and replant if need be 4) replant or rework buffer strips 5) mow and cut perennial weeds 6) remove all trash and debri 7) treat invasive and noxious species Sched/Sequ, purp/descrip correct answer: Temp, procedural control that involves creating a written plan to address neck bmps and sequencing of construct activities to mitigate the erosive effects of wind,water and construct activities. Sched/Sequ: object correct answer: 1) site planning & management 2) erosion control
Document information
- Uploaded on
- September 4, 2023
- Number of pages
- 46
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers