ACI Concrete Field Testing Technician - Grade I questions with correct answers
The end of the temperature sensing portion of the temperature measuring device is submerged a minimum of __mm [__in.] into the freshly mixed concrete. Answer 77mm /3in. The temperature measuring device shall be capable of accurately measuring the temperature of freshly mixed concrete to +- __C [+__F] throught a range of __. Answer 0.5 C / +-1F / 0-50 Decrees C The temp. measuring device shall be verified __, or whenever there is a question of __. Answer Annually / accuracy The temp of concrete may be measured in a wheelbarrow? T/F Answer True The temp. of concrete may be measured in a wall form. T/F Answer True A composite sample of concrete is required even if the only purpose for obtaining the sample is to determine temp. T/F Answer False What must be done to the sample container prior to sampling the concrete Answer It must be dampened with water What must be done to the concrete surroun
Escuela, estudio y materia
- Institución
- Field tech
- Grado
- Field tech
Información del documento
- Subido en
- 15 de julio de 2023
- Número de páginas
- 8
- Escrito en
- 2022/2023
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
aci concrete field testing technician grade i qu
Documento también disponible en un lote