Quality Management Plan
Project Deliverables Quality Standard Quality Control Frequency
Activity
Phase A Find out the needs of Implementing Monthly till the phase
the sponsors, the specific hiring lasts
work that needs to be procedures to hire
done on the project, individuals to carry
research the regional out tasks.
documentation Implementing
procedures. specific qualifications
for deciding the
contractor.
Phase B Identify professional Timely execution of Monthly till the phase
standards, legal, contract fee payments lasts
environmental and and for conditional
other codes in the approvals.
region
Phase C Identify market rate Evaluate the skills Monthly
for both the and qualifications of
contractor and the the project manager
project manager. and contractor as well
Proper field as the level of
surveying, sampling contribution;
of the site. remuneration
according to the
market standards.
Take detailed Once during the
measurements of all project
the fields
Have the required Weekly till the phase
trailer available on lasts
site for all times.
Phase D Ensuring structural Regular site Quarterly
and mechanical work inspection and
is being conducted consultations from
according to the plan the structural
created by the engineer.
Project Deliverables Quality Standard Quality Control Frequency
Activity
Phase A Find out the needs of Implementing Monthly till the phase
the sponsors, the specific hiring lasts
work that needs to be procedures to hire
done on the project, individuals to carry
research the regional out tasks.
documentation Implementing
procedures. specific qualifications
for deciding the
contractor.
Phase B Identify professional Timely execution of Monthly till the phase
standards, legal, contract fee payments lasts
environmental and and for conditional
other codes in the approvals.
region
Phase C Identify market rate Evaluate the skills Monthly
for both the and qualifications of
contractor and the the project manager
project manager. and contractor as well
Proper field as the level of
surveying, sampling contribution;
of the site. remuneration
according to the
market standards.
Take detailed Once during the
measurements of all project
the fields
Have the required Weekly till the phase
trailer available on lasts
site for all times.
Phase D Ensuring structural Regular site Quarterly
and mechanical work inspection and
is being conducted consultations from
according to the plan the structural
created by the engineer.