MSSC CPT Maintenance Awareness practice Test Correctly Answered!!
MSSC CPT Maintenance Awareness practice Test Correctly Answered!! A burn or pungent odor of oil indicates___________ - excessive temperature A chain should be replaced when its length becomes________ longer than the original length. - 3% A common sign of a misaligned coupling is _________ - excessive vibration A mustimeter is a multipurpose devise that can measure_________________ - voltagecurrent-resistance A power diagram is used in addition to a ladder diagram to determine________ - all of the above A power tool has the ground prong broken off of the plug on the power cord. What should be done? - Remove the power tool from service A shaft coupling may be out of round if a dial indicator shows______ - any movement A sight glass in a reservoir usually indicates the _____ of fluid - level A tool should sharpened____________ - When an unacceptable surface finish is present A viscos meter is a device used for measuring the viscosity of an oil and is generally __________ accurate - 95%-99% A workstation should be designed to minimize motions that can________ - cause repetitive/ stress injuries All designed workstation places tools and equipment where they can be__________ - available with minimum stress All documentation of preventive maintenance should be kept________ - in a designated, safe and secure location An electrical diagram that arranges wires of a circuit into order rows is called a __________ - ladder diagram.
Escuela, estudio y materia
- Institución
- MSSC
- Grado
- MSSC
Información del documento
- Subido en
- 19 de abril de 2023
- Número de páginas
- 7
- Escrito en
- 2022/2023
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
mssc cpt maintenance awareness practice test correctly answered
-
mssc cpt maintenance awareness practice test
-
mssc cpt maintenance awareness practice test answered
-
mssc cpt maintenance awareness
-
m
Documento también disponible en un lote