Examen

AAAE CM Module 2 with Complete Solutions

Document preview thumbnail
Vista previa 3 fuera de 26 páginas

NPIAS - ANSWER-Federal plan for airports, addresses development and planning on projects eligible for AIP. State Aviation System Plans - ANSWER-more detailed on how airports within a state can meet states needs Metropolitan or Regional System Plans - ANSWER-more specific indexable and consider capacity, intermodal access and local travelers Airport Areas - ANSWER-Airside, Landside Landside - ANSWER-intermodal access,parking, rental cars ticketing, bag claims, etc Airside Areas - ANSWER-Runways, taxiways, fence, etc. ALP-Grant Assurance 29 - ANSWER-requires ALP be updated at all times, shows land, terminal and facilities. protection zones, approach areas, proposed development and unusual design features ALP Contents - ANSWER-Standard ALP contains following: 1 Cover sheet-signature blocks, and location maps 2 ALP Sheet-data of existing and fyture airfield layout 3 Airport Layout Drawing 4 Airport Airspace Drawing-intended to show imaginary surfaces 5 Inner Portion of Approach Drawing-profile view of runway approaches and obstructions and surfaces associated with the Terminal Instrment Procedures (TERPS) 6 Terminal Area Drawing-and plan depicting terminal and surrounding facilities and heights. lighting and obstructions, also highway routes to and from airport and main business district 7 Land Use Drawing-on Airport and off airport depicting existing and recommended use of all land with property line to at least the 65 DNL noise contours 8 Runway Departure Surfaces Drawing-depicts available departure surfaces 9 Airport Property Map-how tracts were acquired and easements, termed EXHIBIT A on AIP grant applications 10 Data sheet-airport and runway data tables and wind rose(diagram showing percentage of time wind blows from a direction and speed) 11. Facilities layout-exisisting and future facilities 12 Utilities drawing-location and capacity of utilities 13 Airport access plan-major routes and modes of transportation that serve airport ALP is signed by FAA making it a legal document, drawings typically done with computer design software that link features on map with Geographic Information Systems (GIS), FAA uses eALP which allows sharing ALP data 5 Primary Functions of ALP - ANSWER-1 FAA approved plan required to receive AIP and PFC funding 2 blueprint for airport development 3 public document that serves as a record of aeronautical requirements 4 enables FAA and Sponsor to plan for future improvements 5 working tool for staff, Notice of Propsed Construction or Alteration-FAA StNdard Form SF-7460-1 - ANSWER-notification of construction or alteration has to be given 30 days in advance Notice of Landing Area Proposal-Form SF-7480-1 - ANSWER-notification of activation or alteration of a landing area ALP - ANSWER-ALP should be Reviewed and Vaidated every 2-7 years. Necessary when existing ALP cannot accommodate forecast needs or meet design standards Grant Assurance Requirements for ALP - ANSWER-1 Property lines 2 location and nature of existing and proposed facilities (ie. runways, taxiway, parking lots) 3 existing and proposed non-aviation areas and improvements (ie. parking lots, access roads, water retention ponds) ALP Approval - ANSWER-FAA approves that ALP must be Safe, Useful and Efficient. ALP must be submitted at Airports District Office (ADO) Safe - ANSWER-safe operation of aircraft Useful - ANSWER-make best use of airport land while minimizes impact of offairport structures Efficient - ANSWER-planned capacity is sufficient for forecast demand FAA ALP 3 Levels of Approval - ANSWER-Unconditional (met environmental processing), Conditional(environmental processing has not been completed for all items) and Mixed (completed elements can proceed others cannot until approval is received) National Environmental Policy Act (NEPA) - ANSWER-review for environmental FAAs Airport Data and Information Program - ANSWER-guides sponsors on collection, submission and management or airpirt data ensuring airport users most current information-achived through AIRPORT MASTER RECORD Airport Master Record - ANSWER-describes basic operational and services data of the airports Airport Data Record- 5010 Form - ANSWER-Airport operator required to complete annually, FAA uses to complete aeronautical charts and Airport Facility Directory (A/FD) Airport Facility Directory (A/FD) - ANSWER-pilots use as reference (runway lengths, Airport use, elevation and runway slope) Form 7460 Notice of Proposed Construction or Alteration-Part 157 Requirement - ANSWER-required whenever there is proposed development Form 5010 and NOTAMS - ANSWER-Pilits rely on information internet A/FD (provided on Form 5010). Temporary changes are issued as NOTAMS. NOTAMS can be cancelled when the information becomes part of the A/FD Planning Levels - ANSWER-1 NPIAS 2 Statewide integrated airport systems 3 Regional/metropolitan integrated airport systems 4 Airport Master Plans Basic Guiding Principle of Planning Process - ANSWER-development of a safe efficient airport system with uniform design and operational standards NPIAS Project Categories - ANSWER-1 Purpose-safety, rehabilitation, capacity, standards 2 Physical Component-runway, taxiway, apron, equipment acquisition 3 Type of work-construct, expand, improve Metropolitan (or Regional) Airport System Plan (MASP) & State Aviation System Planning (SASP) - ANSWER-plan that asses how to integrate within the area, identifies role of each airport in the area and forecasts proposed future activities Airport Sysrem Planning 4 elements - ANSWER-1 system needs identification 2 system-wide development cost estimate 3 studies,surveys and other planning actions to decide which aeronautical needs will be met. 4 standards prescribed by state for development on non-primary public use airports Airport Master Plan - ANSWER-primary document for long range planning. sets direction of development for an. airport for up to 20 years, includes public involvement, FAA does not require that it has to be updated at certain time schedule but it is recommended (usually conducted every 8-15 years) Plans are completely tailored to individual airport, may be encouraged by ADO to receive funding for AIP projects. Goal of Master Plan - ANSWER-provide framework for future development that is cost effective and satisfies the needs of the airport, market and community while balancing environmental and socioeconomic impacts. Sequenced into Airport Capital Improvement Plan and eligible for federal funding Master Plan is intended to produce - ANSWER-1 technical report-analysis conducted 2 summary report-facts, conclusions and recommendations 3 Updated ALP 4 Webpage-airport information and key elements of master plan 5 Public Information Kit-visual aids, models, brochures to support plan Acceptance vs. Approval - ANSWER-Accepting-FAA has reviewed the elements of the plan to ensure sound planning techniques were applied. The FAA Approves the forecast and ALP Master Plan Part 1: Pre-Planning - ANSWER-type and level of detail of study needs to be determined Consultant Selection Guidance - ANSWER-Architectural, Engineering and Planning Consultant Srvices for Airport Grant Projects FAA AC 150/5100-14, AIRPORT CONSULTANTS COUNCIL's (ACC) reference "Guidelines to Selecting Airport Consultants". Consultant selection process is governed by the BROOKS ACT -requires selection be made based on qualifications and be awarded by fair and open selection process , consultants are usually hired before issuing RFPs, RFQs or Statements of Qualifications (SOQ). Process start with invitation to submit information via RFP or RFQ Topics addressed in Master Plan study - ANSWER-1 Goals and Objectives-why is MP study being conducted and key issues for future development 2.Data Availability-available forecasts and current data and data needed to be collected 3. Forecast Horizons-ie. 5, 10 ,15 years. Planning Activity Levels are increasingly being used 4. Environmental Considerations-Operator should determine if Environmental Assessment (EA) or Environmental Impact Study (EIS) will be required 5. Schedules-decision points requiring FAA or Sponsor approval to proceed 6. Deliverables-work and level of detail required 7. Coordination of Public Involvement- level of public involvement based on complexity of study 8. Budget-scope of work and fees Part 2: Public Involvement - ANSWER-An effective PUBLIC AWARENESS CAMPAIGN is essential. The public involvement program shares information and collaborates on decision-making. Program should include Officials, residents, travelers, tenants, FAA-group known as stakeholders. TECHNICAL ADVISORY COMMITTEE (TAC) and CITIZENS ADVISORY COMMITTEE (CAC) -Committees that facilitate involvement Part 3: Environmental Considerations - ANSWER-identify potential environmental impact and required permits. Airport Environmental Handbook FAA Order 5050.4A should be consulted a guide. There are approx. 40 laws, executive orders and regulations governing environment ie. Clean Air Act, Clean Water Act, Endangered Species Act. A balance needs to be achieved between man-made and natural environment Part 4: Existing Conditions and Issues - ANSWER-aka Inventory (of pertinent data). Historical Review of airport, Airspace Structures, NAVAIDS, airport-related land use. aeronautical activity, socioeconomic factors Classifications used in this element of Master Plan - ANSWER-1. Airfield/Airspace 2. Commercial Passenger Termial Facilities 3. General Aviation Facilities 4. Cargo Facilities 5. Support Facilities ie. ARFF, Airport admin, fuel storage, control tower 6. Access. Circulation and Parking 7. Utilities Non-aeronautical Facilities Part 5: Aviation Demand Forecasts - ANSWER-Forecasts of future levels of aviation activity are the basis for effective airport planning. Short-term (up to 5 years) near-term development, operational planing and environmental improvement. Medium-term- 6-10 year time frame used in planning capital improvements. Long-term-10+ years helpful for general planting. There are a number of forecasts including the OFFICIAL AIRLINE GUIDE (OAG) Aviation Deman Elements - ANSWER-1. Aircraft Operation (take off or landing) 2. Local Operations-arrivals and departures that stay in local traffic pattern and training flights within 20 miles of airport, instrument approaches 3. Itinerant Operations-arrivals and departures other than local 4. Enplaned Passengers-#of paying passengers that depart airport on commercial flight 5. Enplaned Air Cargo-total tonnage departing on aircraft 6. Aircraft Mix-categories of aircraft: less than 12,500 pounds, 12,500-60,000 pounds and over 60,000 and helicopter Factors used to Forecast Demand - ANSWER-1. Economic Characteristics-a communities economic character 2. Demographic Characteristics- size and composition of airport communities population and potential growth rate. 3. Geographical Attributes-spatial distribution and proximity of populations and commerce centers 4. Aviation Related Factors-fuel prices, regulatory environment, taxes, business activities, local attitudes towards aviation. 5. Other Factors-actions taken by authorities or Operators ie. user charges, plans for future development and economic fluctuations Forecast Process - ANSWER-1. identification of aviation activity measures 2. review of previous forecasts 3. collection of data 4. selection of appropriate forecast methods Common Forecadt Techniques - ANSWER-1. Regression Analysis-tying aviation demand to enplanements, population, and income levels 2. Trend Analysis and Extrapolation-uses historical pattern of activity to project future trends 3. Market Share Analysis-local forecasts represent a market share or percentage of national forecasts 4. Smoothing-technique applied to historical data focused more on recent trends and conditions Part 6: Facility Requirements - ANSWER-Compare current facilities and services with forecasted demand then determine needed facilities and services ("gap analysis") 1. Airfield and Airspace 2. Commercial Service Terminal 3. General Aviation Requirements 4. Air Cargo Requirements 5. Support Facilities 6. Ground Access, Circulation and Parking Part 7: Alternative Development and Evaluation - ANSWER-Planners should revisit overall intent of study and consider alternatives and do further research on alternatives or eliminate them.Long-term land acquisition, environmental issues and funding through AIP or PFC should be considered Part 8: ALP - ANSWER-ALP update is part of the Master Plan Part 9: Facilities Implementation Plan - ANSWER-Explains how to implement the findings and recommendations of the planning effort, suggests plans to include in the future CIP (or Transportation Improvement Plan TIP), plan must address airport's planned capital projects to ensure adequate resources are available Part 10: Financial Feasibility Analysis - ANSWER-ability to fund recommended projects Design Aircraft - ANSWER-in most cases composite aircraft with 3 parameters: 1. Aircraft Approach Category (AAC), 2. Airplane Design Group (ADG) 3. Runway Design Code (RDC) Largest aircraft using airport more than 500 times/year Runway Design Code (RDC) - ANSWER-Design standards to which a runway is built.. The Aircraft Approach Category (AAC)-speed, Airplane Design Group (ADG)-wing span and tail height and approach visibility minimums form the RDC of a runway Taxiway Design Group (TDG) - ANSWER-undercarriage dimensions of aircraft width and fillet (corner connecting 2 taxiways) Taxiway Edge Safety Margin (TESM) - ANSWER-pavement in the form of fillets for main gear to go around corners Airport 3 Major Areas - ANSWER-1. Landside 2. Terminal 3. Airside Movement Areas - ANSWER-required by Title 14 CFR Part 139 area to be used by air carrier operations ie. runways and taxiways and areas used for taxiing, takeoff and landing Movement areas generally under positive control of ATCT and include runways and taxiways and other areas specified in Letters of Agreement ( LOA) or MOU between ATCT and airport management Nonmovement Areas - ANSWER-Loading ramps, aircraft parking aprons unpaved areas and areas airport management has decided air carriers won't use. Any airport with ATCT has to must delieate movement and nonmovement areas aircraft and vehicles don't need ATCT permission to move in the nonmovement areas but do need to follow airport rules Airport Certification Manual (ACM) - ANSWER-Movement areas listed in ACM need to meet Part 139 standards, nonmovement areas don't but shouldn't be neglected Airport Operations Area (AOA) - ANSWER-commonly considered '"airside" it is area used for take off,, landing or surface maneuvering and is a security term not FAA term. Encompasses movement and nonmovement areas Substantial Use - ANSWER-500 or more annual itinerant operations or largest scheduled commercial aircraft FAA Requirements for federally funded airport development projects - ANSWER-1. Safe Operations 2. Increasing capacity and efficiency 3. Reducing delays


Información del documento

Subido en
4 de marzo de 2023
Número de páginas
26
Escrito en
2022/2023
Tipo
Examen
Contiene
Preguntas y respuestas
$13.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
LUCKYSTAR2022
3.5
(163)
Vendido
931
Seguidores
727
Artículos
9664
Última venta
2 semanas hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes

Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.