100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Entrevista

IB ESS EIA Case Study - Three Gorges Dam, Yangtze River, China

Puntuación
-
Vendido
-
Páginas
2
Subido en
16-11-2022
Escrito en
2022/2023

assess the value of the EIA that was made. answers Summarize the environmental costs and social benefits of the Three Gorges Dam project.

Institución
Grado








Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Libro relacionado

Escuela, estudio y materia

Institución
Escuela secundaria
Año escolar
5

Información del documento

Subido en
16 de noviembre de 2022
Número de páginas
2
Escrito en
2022/2023
Tipo
Entrevista
Empresa
Desconocido
Personaje
Desconocido

Temas

Vista previa del contenido

EIA Case Study - Three Gorges Dam,
Yangtze River, China
1. The dam has been operating since 2009, and as well as the extinction of the Chinese
river dolphin other environmental impacts have resulted from it. Research some of these
and try to assess the value of the EIA that was made.


The project has threatened not just animal species, but also over 57 plant species.
The Yangtze River's fish population has also declined. This is owing to the river's and
surrounding lakes' lower levels. Those species that have been decreased are
extremely rare, and the loss of so many of them is unimaginable. Even if the energy
produced has been highly environmentally friendly, I do not believe it is worth
damaging plant and animal habitats, which might eventually lead to their extinction.


2. Summarize the environmental costs and social benefits of the Three Gorges Dam
project.


The project's societal advantages include the fact that the energy generated is
sustainable and will reduce carbon dioxide emissions from other energy sources. The
environmental consequences include a reduction in the population of animals and
plants as well as the destruction of their natural habitat. There has also been a social
impact, which is a shift in the way of life for the people that live nearby, forcing them to
adjust to new methods of generating food and money.


3. Evaluate the overall usefulness of the EIA.


The energy produced is sustainable and accounts for one-eighth of the total energy
required to feed China. It has also reduced flood control to a negligible extent. The
area around the project has seen increased economic growth. It has decreased
carbon dioxide emissions caused by energy generation.


4. Using this example, highlight and discuss the strengths and weaknesses of EIAs.


The advantages of EIAs include that when a project is being evaluated, an EIA may
examine the beneficial impacts on the environment while also taking into account the
negative implications. When the information is ready, everything should be thoroughly
considered before making the best option for the environment. The shortcomings
include that no one can ever estimate all of the environmental costs, as some may
emerge during development or years after the project is completed. They might be
worse and not balanced sufficiently by the good consequences, but it will be too late
because the initiative would have become a reality.
$6.62
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
goshogamera

Conoce al vendedor

Seller avatar
goshogamera
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
1
Miembro desde
3 año
Número de seguidores
1
Documentos
7
Última venta
2 año hace
IB materials

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes