Which symbol following a periodicity code indicates that the procedure is intended to be scheduled and performed by either Ship's Force or Off-Ship Maintenance Personnel?
Two plus signs
What is the purpose of a Maintenance Requirement Card?
Provide detailed procedures for performing maintenance requirements
Which of the following is one of the primary 3M responsibilities of the Department Head?
Review and or approve alert details along with check notes/flip page reports
What does the acronym NMR mean?
No Maintenance Required
Who is responsible for reviewing PMS assignments, perform quality maintenance IAW procedural documentation?
Maintenance Person
What is the top hierarchy for MIP line out?
MIP scheduling aid
What is the primary source data for maintenance scheduling software?
Navy PMS CD/DVDs
What does TGL stand for?
Tag Guide List
This control document is used for administering labels (OOC and CAL). It provides sequential listing of all OOC and CAL instruments?
Instrument Log
What provides a listing of the MIPs for systems and equipment assigned to each Work Center, and systems and equipment not requiring PMS or currently being evaluated for PMS?
List of Effective Pages
Which of the following are NOT identification markers on shipboard HAZMAT containers?
SYSCOM Control Number
What is the purpose of the Current Ships Maintenance Project (CSMP)?
Provides shipboard maintenance managers with a consolidated listing of deferred maintenance to identify the material condition of the ship.
What does INSURV stand for?
Board of Inspection and Survey
What is the three segment code used for cataloging MRCs?
SYSCOM MRC Control Number
Technical PMS discrepancies that could have a detrimental effect on personal safety, safety of ship, or could result in significant equipment damage, are classified as what type of Technical Feedback Report?
Urgent
Who is responsible for ensuring the adequacy and accuracy of all tag-outs, including those proposed by the RA.? They shall also verify that tags, which are no longer needed, are removed as soon as possible after the operation/work line item(s) has been cleared.
Ship's Force
If there is no IEM maintenance provided, the activity will request assistance from what specific entity in obtaining direction?
Type Commander (TYCOM)
What provides detailed procedures for performing maintenance requirements and describes who, what, how, and with what resources a specific maintenance requirement will be accomplished?
MRCs
What reference is designed to provide the user with a ready reference for all aspects concerning the 3-M program?
NAVSEAINST 4790.8C
A Category B (Technical FBR) is used for what purpose?
Used to report technical discrepancies inhibiting PMS performance.
This event is based on the current value of a measurement in relation to the value at the time of the last accomplishment?
Metered Event
For metered events, how often must meters be updated in SKED?
Weekly or when required
What is a 7 character alphanumeric code which is assigned to each MRC?
SYSCOM MRC Control Number
What is Status II IEM?
Equipment scheduled for overhaul for 7 days or greater
What documentation must be verified, prior to conducting maintenance on a piece of equipment using portable power tools?
A current safety inspection from the electrical tool issue room
What delineates how frequently the maintenance requirement must be performed?
Periodicity Code
After tag posting is complete, a second person shall .......
independently ensure that the correct component is tagged, and check (verify) proper component positioning.
If a maintenance person identifies missing or damaged tags, who should be notified immediately?
Authorizing officer
Ship's Force qualification in the Tag-out User's Manual should be done by the completion of what PQS?
3M 301 Personnel Qualification Standard and, if required, completion of departmental qualifications
What is required when HAZMAT is transferred from the primary container to a secondary container?
A label has to be attached
Who has overall responsibility for ensuring maintenance is accomplished following the 3M System?
Commanding Officer
A paper printed TORS or electronic form from ESOMS will be maintained for how long?
13 weeks
Upgrade to remove ads
Only $35.99/year
The intentional placement of a piece of equipment/system in a hibernated state for a specific duration with the intention of reactivating at the end of that duration is defined as what?
Inactive Equipment
What does TPMTE stand for?
Tools, Parts, Materials, and Test Equipment
Which of the following are examples of IEM Periodicity Codes?
PM, SU, OT
Which of the following best describes Inactive Equipment Maintenance (IEM) Status I?
Equipment that will remain on board and will be inactive for seven days or longer and is not scheduled for corrective maintenance or overhaul
Whose responsibility is it to give a weekly status update on the Work Center's 3-M self-assessment program, CSMP, and PMS accomplishment and Non-accomplishment to the Division officer?
LCPO/LPO
What are the three categories of periodicities?
Calendar, Non-calendar, and Inactive Equipment Maintenance
The intentional placement of a piece of equipment/system out-of-service with no intention of reactivating the equipment/system is defined as what?
Deactivated Equipment
What are the 3 types of spot checks?
Historical, Maintenance Validation, and Monitored Maintenance
A listing of warnings and references which direct attention to possible hazards to personnel which could result in death or injury while doing maintenance are known as?
Safety Precautions
What information is required on the secondary container label?
Material name, Manufacturer name and address and nature of hazard, including target organ.
What can be used to ensure all future requirements such as tools, parts, and test equipment are available for maintenance checks?
Forecasting Report
What does FBR stand for?
Feed Back Report
What instruction dictates the requirements for HAZMAT container labeling?
OPNAVINST 5100.19 (series)
Who can complete weekly close out of maintenance in the absence of the DIVO?
LCPO
Who serves as the overall 3M program technical expert and advisor?
3MC
Which of the following is a responsibility of the Department Head?
Authorize in writing any equipment placed in Inactive Equipment Maintenance status
What must happen when maintenance is not accomplished?
A check note entry is annotated
Who reviews and approves all Split-MIPs?
XO
Which of the following periodicities is a non-calendar periodicity?
R-1W
Which of the following is NOT listed on the List of Effective Pages?
Situational Requirement Report
How many parts are there in the Tag Out Log?
6
Vista previa del contenido
3M LOK
Which symbol following a periodicity code indicates that the procedure is intended to be
scheduled and performed by either Ship's Force or Off-Ship Maintenance Personnel? -
answerTwo plus signs
What is the purpose of a Maintenance Requirement Card? - answerProvide detailed
procedures for performing maintenance requirements
Which of the following is one of the primary 3M responsibilities of the Department
Head? - answerReview and or approve alert details along with check notes/flip page
reports
What does the acronym NMR mean? - answerNo Maintenance Required
Who is responsible for reviewing PMS assignments, perform quality maintenance IAW
procedural documentation? - answerMaintenance Person
What is the top hierarchy for MIP line out? - answerMIP scheduling aid
What is the primary source data for maintenance scheduling software? - answerNavy
PMS CD/DVDs
What does TGL stand for? - answerTag Guide List
This control document is used for administering labels (OOC and CAL). It provides
sequential listing of all OOC and CAL instruments? - answerInstrument Log
What provides a listing of the MIPs for systems and equipment assigned to each Work
Center, and systems and equipment not requiring PMS or currently being evaluated for
PMS? - answerList of Effective Pages
Which of the following are NOT identification markers on shipboard HAZMAT
containers? - answerSYSCOM Control Number
What is the purpose of the Current Ships Maintenance Project (CSMP)? -
answerProvides shipboard maintenance managers with a consolidated listing of
deferred maintenance to identify the material condition of the ship.
What does INSURV stand for? - answerBoard of Inspection and Survey
What is the three segment code used for cataloging MRCs? - answerSYSCOM MRC
Control Number
Technical PMS discrepancies that could have a detrimental effect on personal safety,
safety of ship, or could result in significant equipment damage, are classified as what
type of Technical Feedback Report? - answerUrgent