• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 1 fuera de 4 páginas
Examen

3M LOK

Document preview thumbnail
Vista previa 1 fuera de 4 páginas

Which symbol following a periodicity code indicates that the procedure is intended to be scheduled and performed by either Ship's Force or Off-Ship Maintenance Personnel? Two plus signs What is the purpose of a Maintenance Requirement Card? Provide detailed procedures for performing maintenance requirements Which of the following is one of the primary 3M responsibilities of the Department Head? Review and or approve alert details along with check notes/flip page reports What does the acronym NMR mean? No Maintenance Required Who is responsible for reviewing PMS assignments, perform quality maintenance IAW procedural documentation? Maintenance Person What is the top hierarchy for MIP line out? MIP scheduling aid What is the primary source data for maintenance scheduling software? Navy PMS CD/DVDs What does TGL stand for? Tag Guide List This control document is used for administering labels (OOC and CAL). It provides sequential listing of all OOC and CAL instruments? Instrument Log What provides a listing of the MIPs for systems and equipment assigned to each Work Center, and systems and equipment not requiring PMS or currently being evaluated for PMS? List of Effective Pages Which of the following are NOT identification markers on shipboard HAZMAT containers? SYSCOM Control Number What is the purpose of the Current Ships Maintenance Project (CSMP)? Provides shipboard maintenance managers with a consolidated listing of deferred maintenance to identify the material condition of the ship. What does INSURV stand for? Board of Inspection and Survey What is the three segment code used for cataloging MRCs? SYSCOM MRC Control Number Technical PMS discrepancies that could have a detrimental effect on personal safety, safety of ship, or could result in significant equipment damage, are classified as what type of Technical Feedback Report? Urgent Who is responsible for ensuring the adequacy and accuracy of all tag-outs, including those proposed by the RA.? They shall also verify that tags, which are no longer needed, are removed as soon as possible after the operation/work line item(s) has been cleared. Ship's Force If there is no IEM maintenance provided, the activity will request assistance from what specific entity in obtaining direction? Type Commander (TYCOM) What provides detailed procedures for performing maintenance requirements and describes who, what, how, and with what resources a specific maintenance requirement will be accomplished? MRCs What reference is designed to provide the user with a ready reference for all aspects concerning the 3-M program? NAVSEAINST 4790.8C A Category B (Technical FBR) is used for what purpose? Used to report technical discrepancies inhibiting PMS performance. This event is based on the current value of a measurement in relation to the value at the time of the last accomplishment? Metered Event For metered events, how often must meters be updated in SKED? Weekly or when required What is a 7 character alphanumeric code which is assigned to each MRC? SYSCOM MRC Control Number What is Status II IEM? Equipment scheduled for overhaul for 7 days or greater What documentation must be verified, prior to conducting maintenance on a piece of equipment using portable power tools? A current safety inspection from the electrical tool issue room What delineates how frequently the maintenance requirement must be performed? Periodicity Code After tag posting is complete, a second person shall ....... independently ensure that the correct component is tagged, and check (verify) proper component positioning. If a maintenance person identifies missing or damaged tags, who should be notified immediately? Authorizing officer Ship's Force qualification in the Tag-out User's Manual should be done by the completion of what PQS? 3M 301 Personnel Qualification Standard and, if required, completion of departmental qualifications What is required when HAZMAT is transferred from the primary container to a secondary container? A label has to be attached Who has overall responsibility for ensuring maintenance is accomplished following the 3M System? Commanding Officer A paper printed TORS or electronic form from ESOMS will be maintained for how long? 13 weeks Upgrade to remove ads Only $35.99/year The intentional placement of a piece of equipment/system in a hibernated state for a specific duration with the intention of reactivating at the end of that duration is defined as what? Inactive Equipment What does TPMTE stand for? Tools, Parts, Materials, and Test Equipment Which of the following are examples of IEM Periodicity Codes? PM, SU, OT Which of the following best describes Inactive Equipment Maintenance (IEM) Status I? Equipment that will remain on board and will be inactive for seven days or longer and is not scheduled for corrective maintenance or overhaul Whose responsibility is it to give a weekly status update on the Work Center's 3-M self-assessment program, CSMP, and PMS accomplishment and Non-accomplishment to the Division officer? LCPO/LPO What are the three categories of periodicities? Calendar, Non-calendar, and Inactive Equipment Maintenance The intentional placement of a piece of equipment/system out-of-service with no intention of reactivating the equipment/system is defined as what? Deactivated Equipment What are the 3 types of spot checks? Historical, Maintenance Validation, and Monitored Maintenance A listing of warnings and references which direct attention to possible hazards to personnel which could result in death or injury while doing maintenance are known as? Safety Precautions What information is required on the secondary container label? Material name, Manufacturer name and address and nature of hazard, including target organ. What can be used to ensure all future requirements such as tools, parts, and test equipment are available for maintenance checks? Forecasting Report What does FBR stand for? Feed Back Report What instruction dictates the requirements for HAZMAT container labeling? OPNAVINST 5100.19 (series) Who can complete weekly close out of maintenance in the absence of the DIVO? LCPO Who serves as the overall 3M program technical expert and advisor? 3MC Which of the following is a responsibility of the Department Head? Authorize in writing any equipment placed in Inactive Equipment Maintenance status What must happen when maintenance is not accomplished? A check note entry is annotated Who reviews and approves all Split-MIPs? XO Which of the following periodicities is a non-calendar periodicity? R-1W Which of the following is NOT listed on the List of Effective Pages? Situational Requirement Report How many parts are there in the Tag Out Log? 6

Vista previa del contenido

3M LOK
Which symbol following a periodicity code indicates that the procedure is intended to be
scheduled and performed by either Ship's Force or Off-Ship Maintenance Personnel? -
answerTwo plus signs

What is the purpose of a Maintenance Requirement Card? - answerProvide detailed
procedures for performing maintenance requirements

Which of the following is one of the primary 3M responsibilities of the Department
Head? - answerReview and or approve alert details along with check notes/flip page
reports

What does the acronym NMR mean? - answerNo Maintenance Required

Who is responsible for reviewing PMS assignments, perform quality maintenance IAW
procedural documentation? - answerMaintenance Person

What is the top hierarchy for MIP line out? - answerMIP scheduling aid

What is the primary source data for maintenance scheduling software? - answerNavy
PMS CD/DVDs

What does TGL stand for? - answerTag Guide List

This control document is used for administering labels (OOC and CAL). It provides
sequential listing of all OOC and CAL instruments? - answerInstrument Log

What provides a listing of the MIPs for systems and equipment assigned to each Work
Center, and systems and equipment not requiring PMS or currently being evaluated for
PMS? - answerList of Effective Pages

Which of the following are NOT identification markers on shipboard HAZMAT
containers? - answerSYSCOM Control Number

What is the purpose of the Current Ships Maintenance Project (CSMP)? -
answerProvides shipboard maintenance managers with a consolidated listing of
deferred maintenance to identify the material condition of the ship.

What does INSURV stand for? - answerBoard of Inspection and Survey

What is the three segment code used for cataloging MRCs? - answerSYSCOM MRC
Control Number

Technical PMS discrepancies that could have a detrimental effect on personal safety,
safety of ship, or could result in significant equipment damage, are classified as what
type of Technical Feedback Report? - answerUrgent

Información del documento

Subido en
8 de junio de 2022
Número de páginas
4
Escrito en
2021/2022
Tipo
Examen
Contiene
Preguntas y respuestas
$17.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Arthurmark
3.7
(9)
Vendido
45
Seguidores
39
Artículos
1414
Última venta
1 año hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes