100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

BUSN333 Quiz_2 Chapters 3&4 (ASSUERED A) <100% CORRECT> GRADED A+ | LATEST SOLUTIONS |

Puntuación
-
Vendido
-
Páginas
5
Grado
A+
Subido en
10-11-2021
Escrito en
2020/2021

BUSN333 Quiz_2 Chapters 3&4 (ASSUERED A) &lt;100% CORRECT&gt; GRADED A+ | LATEST SOLUTIONS | Part 1 of 2 - 50.0/ 50.0 Points Question 1 of 20 All of the following are disadvantages of organizing projects within a matrix arrangement EXCEPT A. Dysfunctional conflict between functional managers and project managers. B. Expensive. C. Infighting. D. Stressful. E. Longer project duration. Question 2 of 20 A project team that operates with a full-time project manager as a separate unit from the rest of the organization is structured using ________ organization. A. Functional B. Balanced matrix C. Weak matrix D. Strong matrix E. Projectized Question 3 of 20 Factors in identifying cultural characteristics include all the following EXCEPT A. Norms. B. Customs. C. Values. D. Attitude. E. All of these are factors in identifying cultural characteristics. Question 4 of 20 Which of the following is an advantage of a functional project management organization? A. Maximum flexibility in the use of staff Tests & Quizzes B. Good integration across functional units 2/6 5.0/ 5.0 Points 5.0/ 5.0 Points 5.0/ 5.0 Points 5.0/ 5.0 Points C. Shorter project duration D. Strong motivation of project team members E. Longer project duration Question 5 of 20 Elizabeth is considering how to structure a project team that will not directly disrupt ongoing operations. The project needs to be done quickly and a high level of motivation will be needed in order to do that. For this situation, the ______ organization would be the best choice. A. Functional B. Balanced matrix C. Weak matrix D. Strong matrix E. Projectized Question 6 of 20 Which of the following cultural characteristics relates to the degree to which groups within the organization are encouraged to operate in a coordinated or independent manner? A. Member identity B. Team emphasis C. Managerial focus D. Unit integration E. Control Question 7 of 20 Who is responsible for determining how tasks will be done in a weak matrix project management structure? A. The functional manager B. The project manager C. Both the functional manager and the project manager are responsible D. There is no rule established for who takes responsibility E. This is negotiated Question 8 of 20 The structure that manages projects within the existing organizational structure is __________ organization. A. Functional B. Balanced matrix C. Weak matrix D. Strong matrix 3/6 5.0/ 5.0 Points 5.0/ 5.0 Points 5.0/ 5.0 Points 5.0/ 5.0 Points E. Projectized Question 9 of 20 Which of the following cultural characteristics relates to the degree to which work activities are organized around groups rather than individuals? A. Member identity B. Team emphasis C. Managerial focus D. Unit integration E. Control Question 10 of 20 Which of the following cultural characteristics relates to the degree to which management focuses on outcomes rather than on techniques and processes used to achieve those outcomes? A. Risk tolerance B. Reward criteria C. Conflict tolerance D. Means versus end orientation E. Open-systems focus

Mostrar más Leer menos
Institución
Phoenix College
Grado
BUS









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Información del documento

Subido en
10 de noviembre de 2021
Número de páginas
5
Escrito en
2020/2021
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$5.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
1exampro Phoenix College
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
8
Miembro desde
4 año
Número de seguidores
8
Documentos
127
Última venta
1 año hace

5.0

2 reseñas

5
2
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes