KENTUCKY UST CERTIFICATION EXAM
REVIEW WITH TESTED QUESTIONS AND
CORRECT SOLUTIONS
◉ As an alternative lifting method, should a cable or chain be
wrapped around the tank? Answer: No, Never!
◉ When you are lifting a tank, using the lifting lugs, which of these
procedures should be followed? Answer: attach a triangle cable
through the lugs with no more than a 30 degree angle from the
center line.
◉ After you unload a new tank on a clean level surface at the job site
what else should you do prior to inspection and pre-testing?
Answer: Chock the tank to prevent it from Rolling
◉ which of the following items should be physically checked for
damage or imperfections at the job site? Answer: Piping (steel and
fiberglass)
Fittings, Vents, Fillboxes, anodes, ECT..
The tanks themselves
(ALL OF THE ABOVE)!
◉ STI-P3 tanks are delivered with shipping plugs in tank openings.
What should be done to these plugs prior to testing? Answer:
,remove the plugs and replace them with a standard threaded plug
that is properly doped
◉ should dielectric bushings be installed in all openings of an STI-P3
tank? Answer: yes on all openings
◉ what is the maximum air pressure to which a steel tank should be
subjected in a pre-installation test? Answer: 5 pounds
◉ for fiberglass reinforced plastic (FRP) tanks up to 12 feet in
diameter what is an acceptable air pressure to which the tanks may
be subjected in a pre-installation test? Answer: 3 pounds
◉ for FRP tanks over 12 feet in diameter what is the maximum air
pressure to which the tanks should be subjected in a pre-installation
test? Answer: 3 pounds
◉ when you are conducting an air test on a tank the type of gauge
that should be used is? Answer: a pressure gauge with a maximum
limit of 10 to 15 PSIG
◉ the proper procedure for conducting a pre-installation air test of a
steel tank is to? Answer: apply 3 to 5 pounds of pressure and soap all
surfaces and weld seams visible through the coating while
inspecting for bubbles.
,◉ what is the proper procedure for conducting a pre-installation air
test of an FRP tank Under 12 feet in diameter is to.... Answer: apply 3
pounds of air pressure and soap all surfaces while inspecting for any
sign of a leak either audible or visible in the form of bubbles on the
surface
◉ a double-walled steel tank build in accordance with UL standard
58 is? Answer: requires air testing of the interstitial space prior to
installation
◉ the proper procedure for conducting a pre-installation air test of a
double-walled tank is to? Answer: pressurize the inner tank monitor
the pressure for one hour and then pressurize the space between
the inner and outer tanks with the air from the inner tank
◉ when shipped a steel tank is covered with a coating that is an
important part of the tanks Corrosion Prevention system. "holidays"
which show up in the coating at the installation site should? Answer:
should be touched up with a compatible coating after proper surface
preparation
◉ touch up of holidays in a steel tank coatings at the installation site
should be done....... Answer: according to the manufacturer's
instructions
,◉ dielectric bushings are usually made of what? Answer: non-
metallic material
◉ factors to consider in determining the size shape and depth of a
tank excavation include what? Answer: *the tank manufacturers
recommendations
*the requirements for compacting bedding and backfill as well as
stability of the soil
*the depth of cover
AKA all of the above
◉ in the absence of local requirements the recommended minimum
distance between a tank excavation and adjacent structures or
property lines is how many feet? Answer: 5 feet
◉ reinforcement of a steel underground tank may be required by the
tank manufacturer if Answer: the burial depth is greater than the
tank diameter
◉ according to FRP tank manufacturers specifications the burial
depth for an FRP tank should not exceed how many feet? Answer: 7
feet
REVIEW WITH TESTED QUESTIONS AND
CORRECT SOLUTIONS
◉ As an alternative lifting method, should a cable or chain be
wrapped around the tank? Answer: No, Never!
◉ When you are lifting a tank, using the lifting lugs, which of these
procedures should be followed? Answer: attach a triangle cable
through the lugs with no more than a 30 degree angle from the
center line.
◉ After you unload a new tank on a clean level surface at the job site
what else should you do prior to inspection and pre-testing?
Answer: Chock the tank to prevent it from Rolling
◉ which of the following items should be physically checked for
damage or imperfections at the job site? Answer: Piping (steel and
fiberglass)
Fittings, Vents, Fillboxes, anodes, ECT..
The tanks themselves
(ALL OF THE ABOVE)!
◉ STI-P3 tanks are delivered with shipping plugs in tank openings.
What should be done to these plugs prior to testing? Answer:
,remove the plugs and replace them with a standard threaded plug
that is properly doped
◉ should dielectric bushings be installed in all openings of an STI-P3
tank? Answer: yes on all openings
◉ what is the maximum air pressure to which a steel tank should be
subjected in a pre-installation test? Answer: 5 pounds
◉ for fiberglass reinforced plastic (FRP) tanks up to 12 feet in
diameter what is an acceptable air pressure to which the tanks may
be subjected in a pre-installation test? Answer: 3 pounds
◉ for FRP tanks over 12 feet in diameter what is the maximum air
pressure to which the tanks should be subjected in a pre-installation
test? Answer: 3 pounds
◉ when you are conducting an air test on a tank the type of gauge
that should be used is? Answer: a pressure gauge with a maximum
limit of 10 to 15 PSIG
◉ the proper procedure for conducting a pre-installation air test of a
steel tank is to? Answer: apply 3 to 5 pounds of pressure and soap all
surfaces and weld seams visible through the coating while
inspecting for bubbles.
,◉ what is the proper procedure for conducting a pre-installation air
test of an FRP tank Under 12 feet in diameter is to.... Answer: apply 3
pounds of air pressure and soap all surfaces while inspecting for any
sign of a leak either audible or visible in the form of bubbles on the
surface
◉ a double-walled steel tank build in accordance with UL standard
58 is? Answer: requires air testing of the interstitial space prior to
installation
◉ the proper procedure for conducting a pre-installation air test of a
double-walled tank is to? Answer: pressurize the inner tank monitor
the pressure for one hour and then pressurize the space between
the inner and outer tanks with the air from the inner tank
◉ when shipped a steel tank is covered with a coating that is an
important part of the tanks Corrosion Prevention system. "holidays"
which show up in the coating at the installation site should? Answer:
should be touched up with a compatible coating after proper surface
preparation
◉ touch up of holidays in a steel tank coatings at the installation site
should be done....... Answer: according to the manufacturer's
instructions
,◉ dielectric bushings are usually made of what? Answer: non-
metallic material
◉ factors to consider in determining the size shape and depth of a
tank excavation include what? Answer: *the tank manufacturers
recommendations
*the requirements for compacting bedding and backfill as well as
stability of the soil
*the depth of cover
AKA all of the above
◉ in the absence of local requirements the recommended minimum
distance between a tank excavation and adjacent structures or
property lines is how many feet? Answer: 5 feet
◉ reinforcement of a steel underground tank may be required by the
tank manufacturer if Answer: the burial depth is greater than the
tank diameter
◉ according to FRP tank manufacturers specifications the burial
depth for an FRP tank should not exceed how many feet? Answer: 7
feet