• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 2 fuera de 5 páginas
Examen

NERC Practice Test Question Set - Expert-Verified Solutions

Document preview thumbnail
Vista previa 2 fuera de 5 páginas

NERC Practice Test Question Set - Expert-Verified Solutions a. 100 MW - answer - Using the shown diagram, determine the HVDC schedule. a. 100 MW b. 150 MW c. 200 MW d. 300 MW b. The Balancing Authority would over respond to an external loss of generation - answer - What would be the consequence of an interconnected Balancing Area operating with its AGC in Flat Frequency mode? a. The Balancing Authority would not respond sufficiently to an external loss of generation b. The Balancing Authority would over respond to an external loss of generation c. The primary frequency response from governor action will be withdrawn by AGC d. ACE will no longer be affected by an external loss of generation d. Decrease output of Generator 2 - answer - Use the diagram to answer the following question: Line 2 is exceeding its SOL by 20 MW. Which of the following actions would be most appropriate? a. Increase the HVDC schedule by 50 MW b. Shed load at Load 2 c. Decrease output of Generator 1 d. Decrease output of Generator 2 c. The primary frequency response from governor action will be withdrawn by AGC - answer - What would be the consequence of an interconnected Balancing Area operating with its AGC in Flat Tie-line mode? a. An internal loss of generation would not affect ACE b. The Balancing Authority would over respond to an external loss of generation c. The primary frequency response from governor action will be withdrawn by AGC d. An external loss of generation would not affect ACE b. Shed load at Load 2 - answer - Use the diagram to answer the following question: Line 3 is exceeding its SOL by 20 MW. Which of the following actions would be most appropriate? a. Increase the HVDC schedule by 50 MW b. Shed load at Load 2 c. Decrease output of Generator 1 d. Decrease output of Generator 2 b. EEA 2 - answer - Balancing Authority Z is unable to meet its demand, however, is maintaining its Contingency Reserve requirements. What Energy Emergency Alert level is the Balancing Authority in? a. EEA 1 b. EEA 2 c. EEA 3 d. This condition does not require an EEA c. EEA 3 - answer - Balancing Authority C has implemented demand management procedures per its EOP-011 Emergency Operating Plan for Energy and Capacity Emergencies. The expected demand peak is two hours away and the Balancing Authority is developing a load shed plan for implementation. What level EEA should the Balancing Authority request from the Reliability Coordinator? a. EEA 1 b. EEA 2 c. EEA 3 d. This condition does not require an EEA b. Transmission Operator - answer - A low voltage event has resulted in load shed of 290 MW. Who is responsible for reporting? a. Balancing Authority b. Transmission Operator c. Load Serving Entity d. This is not a reportable event per EOP-004 b. Planned outage of primary control center for 2 weeks - answer - When is a tertiary control center necessary? a. Planned outage of primary control center for 1 week b. Planned outage of primary control center for 2 weeks c. Planned outage of primary control center for 1 month d. Anytime the primary control center is out c. Thermal - answer - Exceeding which of the following transmission line ratings will result in line sag? a. Stability b. Voltage c. Thermal d. PV Curve a. GIC - answer - Which of the following could result in EHV transformer problems and loss of reactive resources? a. GIC b. Sub-synchronous resonance c. Ferranti rise d. AGC malfunction a. Balancing Authority - answer - Which of the following entities is responsible for developing load forecasts? a. Balancing Authority b. Distribution Provider c. Purchase-Selling Entity d. Load-Serving Entity b. PV - answer - What type of solar is instantaneous? a. Concentrated Solar b. PV c. Parabolic Trough d. Saturated Thermal a. MVAR output will decrease - answer - During system restoration, what will a generator producing MVAR do when a nearby line is placed in service? a. MVAR output will decrease b. MVAR output will increase c. MW output will decrease


Información del documento

Subido en
26 de noviembre de 2026
Número de páginas
5
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$10.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
SARAHnkalu
4.6
(7)
Vendido
50
Seguidores
0
Artículos
9092
Última venta
2 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes

Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.