1. TCEQ
Answer:
Adopted the current OSSF Rules in 1997 & revised them several times
Question:
2. Designated Representative
Answer:
Is responsible for reviewing permit applications, site evaluations, planning materials and
conducting inspections of OSSF's.
Question:
3. Installer
Answer:
Individual who holds a valid license from the TCEQ & who is compensated by another
individual to construct install alter or repair an OSSF
Question:
4. Site Evaluator
Answer:
Individual who visits a site and conducts soil evaluations and a site survey
Question:
5. Installer II & Maintenance Provider
Answer:
OSSF licenses that require previous experience
Question:
6. Designated Representative
Answer:
These Individuals working in any capacity for an OSSF authorized agent cannot work as an
installer, Designer for a fee, or private Site Evaluator within jurisdiction of the permitting
authority
Question:
7. Pre-qualifications for an exam
, Answer:
Submit application, pay class and application fees, complete appropriate training course
Question:
8. 3 year term
Answer:
New OSSF licenses are issued for
Question:
9. 24 hours
Answer:
How many hours of the TCEQ approved continuing education course must an individual
complete in order to renew the license
Question:
10. 9 steps of permitting process
Answer:
Site & soil evaluation conducted by Site Evaluator, select OSSF, system planned by qualified
individual, prepare and submit permit application, application and planning materials
reviewed by permitting authority, receive permit to construct, construction, system inspected
at appropriate stages, notice of approval & permit to operate issued by permitting authority
Question:
11. Criminal Penalties/Injunction or civil suit/Administrative Penalties
Answer:
Penalties for violating the laws, rules or regulations covering OSSF
Question:
12. PE (Professional Engineer) or RS (Registered Sanitarian)
Answer:
Planning materials for an OSSF utilizing secondary treatment can be prepared by
Question:
13. Installer II
Answer:
Who can legally install a septic tank followed by a low pressure dosing drain field at a rental
house
Solutions
Question:
1. TCEQ
Answer:
Adopted the current OSSF Rules in 1997 & revised them several times
Question:
2. Designated Representative
Answer:
Is responsible for reviewing permit applications, site evaluations, planning materials and
conducting inspections of OSSF's.
Question:
3. Installer
Answer:
Individual who holds a valid license from the TCEQ & who is compensated by another
individual to construct install alter or repair an OSSF
Question:
4. Site Evaluator
Answer:
Individual who visits a site and conducts soil evaluations and a site survey
Question:
5. Installer II & Maintenance Provider
Answer:
OSSF licenses that require previous experience
Question:
6. Designated Representative
Answer:
These Individuals working in any capacity for an OSSF authorized agent cannot work as an
installer, Designer for a fee, or private Site Evaluator within jurisdiction of the permitting
authority
Question:
7. Pre-qualifications for an exam
, Answer:
Submit application, pay class and application fees, complete appropriate training course
Question:
8. 3 year term
Answer:
New OSSF licenses are issued for
Question:
9. 24 hours
Answer:
How many hours of the TCEQ approved continuing education course must an individual
complete in order to renew the license
Question:
10. 9 steps of permitting process
Answer:
Site & soil evaluation conducted by Site Evaluator, select OSSF, system planned by qualified
individual, prepare and submit permit application, application and planning materials
reviewed by permitting authority, receive permit to construct, construction, system inspected
at appropriate stages, notice of approval & permit to operate issued by permitting authority
Question:
11. Criminal Penalties/Injunction or civil suit/Administrative Penalties
Answer:
Penalties for violating the laws, rules or regulations covering OSSF
Question:
12. PE (Professional Engineer) or RS (Registered Sanitarian)
Answer:
Planning materials for an OSSF utilizing secondary treatment can be prepared by
Question:
13. Installer II
Answer:
Who can legally install a septic tank followed by a low pressure dosing drain field at a rental
house