CONSTRUCTION PROCUREMENT: BIDDING, SELECTION, AND
CONTRACTING METHODS Questions with Correct Solutions
Question:
1. What is the name of the official document the owner uses to notify the contractor to start
construction?
Answer:
Notice to Proceed
Question:
2. What are the two primary selection criteria categories using the best-value method?
Answer:
Price (quantitative factor) and Technical factors (qualitative)
Question:
3. How does the weighted criteria evaluation process work?
Answer:
A scoring system where the owner assigns maximum points to price/qualifications, and the
project is awarded to the contractor who earns the highest total points.
Question:
4. What are three factors considered before bidding a job?
Answer:
Project Risk, owner reputation, Current workload
Question:
5. Why is open bidding required on public projects?
Answer:
To protect taxpayer funds, prevent favoritism, and ensure transparent competition.
Question:
6. What tool is used to reduce the number of bidders on a public project and increase the
quality of contracts?
Answer:
Prequalification
CONTRACTING METHODS Questions with Correct Solutions
Question:
1. What is the name of the official document the owner uses to notify the contractor to start
construction?
Answer:
Notice to Proceed
Question:
2. What are the two primary selection criteria categories using the best-value method?
Answer:
Price (quantitative factor) and Technical factors (qualitative)
Question:
3. How does the weighted criteria evaluation process work?
Answer:
A scoring system where the owner assigns maximum points to price/qualifications, and the
project is awarded to the contractor who earns the highest total points.
Question:
4. What are three factors considered before bidding a job?
Answer:
Project Risk, owner reputation, Current workload
Question:
5. Why is open bidding required on public projects?
Answer:
To protect taxpayer funds, prevent favoritism, and ensure transparent competition.
Question:
6. What tool is used to reduce the number of bidders on a public project and increase the
quality of contracts?
Answer:
Prequalification