BADM 7050
Exam 3 Practice Exam
Information Systems | 80 Original Multiple-Choice Questions + 5
Written-Response Cases
Includes
01 Project management, scheduling & risk 30 questions
02 Business intelligence and analytics 22 questions
03 Knowledge management 10 questions
04 Service & creative-industry applications 10 questions
05 Integrated challenge questions 8 questions
Full answer key • Detailed rationales • Written model answers • Focused concept
review
Alignment note. The course is LSU BADM 7050 (Information Systems). A historical Exam 3 guide describes lectures
7–8, chapters 11–12, and Ritz-Carlton/Cirque case discussions. The September 2026 syllabus and exam blueprint
were not publicly verified, so this resource uses those historical anchors and established information-systems
concepts.
This is independent, original exam preparation—not a copied university test, an official answer key, or a promise of a
passing grade.
Original educational questions • Not an official LSU examination 1
,BADM 7050 / INFORMATION SYSTEMS EXAM 3 • INDEPENDENT 2026 PRACTICE
How to use this practice exam
This booklet is designed for a two-hour practice session resembling one historical Exam 3 format: 80
single-best-answer multiple-choice items and five short-answer prompts. The timing and format are a
practice suggestion, not a claim about the 2026 LSU exam.
1. Simulate Complete the 80 multiple-choice questions first without checking the solutions. Budget
approximately 70–85 minutes.
2. Explain Use the written-response prompts to practice applying a framework, identifying trade-offs, and
proposing justified managerial action.
3. Diagnose Compare your work with the quick key and rationales. Re-study any weak area rather than
memorizing answer letters.
4. Transfer Explain how each decision changes in a different business setting. That application step matters
more than rote recall.
Exam 3 topic map
Question range Study area Core thinking skill
1–30 IT project management Scope, schedule, budget, risk, control
31–52 Business intelligence & analytics Data quality, metrics, modeling, insight
53–62 Knowledge management Tacit/explicit knowledge, reuse, governance
63–72 Business applications Hospitality, creative work, service decisions
73–80 Mixed applications Quantitative reasoning, ethics, governance
Suggested self-check: 1 point per multiple-choice item. For written responses, use the five-point checklist provided
with each model answer. These are study tools, not LSU grading rules.
High-yield concept review
Read these frameworks before your first attempt, or use them after the exam to correct missed concepts.
IT projects: business case to benefits
• The business case states the problem, alternatives, expected value, assumptions, costs, and risks. The
charter authorizes the project; the scope baseline defines agreed deliverables.
• A work breakdown structure decomposes deliverables into work packages. Dependencies and
critical-path analysis organize sequencing; resource leveling accounts for real staffing constraints.
• A risk is an uncertain future event; an issue has already occurred. Typical responses include avoid,
mitigate, transfer, and accept. A risk register records ownership and triggers.
Original educational questions • Not an official LSU examination 2
,BADM 7050 / INFORMATION SYSTEMS EXAM 3 • INDEPENDENT 2026 PRACTICE
• Changes to approved scope should pass through a documented impact assessment covering business
value, budget, time, quality, and risk.
Quantitative tools you must be able to apply
• Schedule variance (SV) = earned value (EV) − planned value (PV). Cost variance (CV) = EV − actual
cost (AC). Negative amounts indicate unfavorable variance.
• Schedule performance index (SPI) = EV / PV. Cost performance index (CPI) = EV / AC. Values below
1 generally flag an unfavorable result.
• Expected monetary value (EMV) = probability × financial impact. PERT expected duration =
(optimistic + 4 × most likely + pessimistic)/6.
• Simple payback = initial investment / annual net cash inflow when annual inflows are level. It ignores
discounting and later cash flows.
Analytics: from reliable data to decisions
• Transaction systems support daily operations. Data warehouses integrate historical records for
reporting; OLAP supports analysis across business dimensions.
• Descriptive analytics asks what happened; diagnostic explores why; predictive estimates future
outcomes; prescriptive supports choices under constraints.
• Data governance manages definitions, ownership, quality, lineage, accessibility, privacy, and
stewardship. Good-looking visualizations cannot rescue misleading data.
• Evaluate models with appropriate out-of-sample tests and business-relevant metrics. Accuracy alone can
conceal missed rare events; recall and precision describe different trade-offs.
Knowledge management: enabling reuse
• Explicit knowledge can be codified in procedures, documents, examples, or databases. Tacit
knowledge often requires practice, mentoring, stories, and observation.
• Repositories need search, taxonomy, metadata, versioning, and content owners. Communities of practice
enable social transfer that a database cannot fully reproduce.
• Useful outcome measures include faster resolution, fewer repeated errors, safer decisions, and faster
onboarding—not simply a count of uploaded files.
Applying concepts to business cases
• Luxury hospitality case lens: consider trustworthy guest data, responsible personalization, frontline
decision rights, service recovery, staff learning, and privacy.
• Creative production case lens: consider project sequencing, cross-functional collaboration, prototypes,
tacit knowledge sharing, and preserving lessons from experimentation.
• These case lenses are original learning scenarios inspired by general industry challenges. They are not
reproduced case-study text or verified facts about specific organizations.
Original educational questions • Not an official LSU examination 3
, BADM 7050 / INFORMATION SYSTEMS EXAM 3 • INDEPENDENT 2026 PRACTICE
Part I | 80 multiple-choice practice questions
Select one best answer (A, B, C, or D) for each question. Correct answers appear only in Part III.
01–30 Project management, project controls, and risk
1. A retailer proposes a new inventory system. Which document formally authorizes the project
and identifies its sponsor and high-level objectives?
A. Work breakdown structure
B. Project charter
C. Risk register
D. Lessons-learned report
2. What is the main purpose of a work breakdown structure (WBS) for an IT implementation?
A. Assign budget codes only after deployment
B. List individual employees in reporting order
C. Decompose deliverables into manageable work packages
D. Replace the requirements approval process
3. A manager adds a reporting dashboard after the software design is approved, but neither
budget nor schedule is changed. What risk is most clearly illustrated?
A. Scope creep
B. Resource leveling
C. Earned value
D. Risk transfer
4. Which statement about the project management triple constraint is most accurate?
A. Improving quality never affects the schedule
B. Scope, time, and cost are related and changes require trade-off analysis
C. Cost is fixed even when staffing increases
D. Schedule estimates can replace scope definition
5. An IT project has several tasks that cannot begin until a database is configured. In a
dependency diagram, those relationships are primarily used to determine what?
A. Employee satisfaction
B. Market share
C. Data classification
D. Valid activity sequencing and schedule paths
Original educational questions • Not an official LSU examination 4