Fdny p-99 c of f Exam 2024 Questions &
Answers 100% Updated!
SECTION 1: BOILER INSTALLATION & LOCATION REQUIREMENTS
(Questions 1–30)
Question 1
What is a general requirement of the location of the installation of a
boiler?
A. Adequate clearance from combustible construction
B. Inadequate clearance from combustible construction
C. Located in a confined space
D. Located below ground level
Correct Answer: A. Adequate clearance from combustible
construction
Rationale: A general requirement of the location of the installation of
a boiler is adequate clearance from combustible construction .
Question 2
What temperature must the materials remain under during combustion?
A. 170 degrees
B. 100 degrees
C. 200 degrees
D. 300 degrees
,Correct Answer: A. 170 degrees
Rationale: The materials must remain under 170 degrees during
combustion .
Question 3
What is a requirement for the access of the boiler?
A. Access for operation and maintenance must not be hazardous
B. Access for operation and maintenance must be hazardous
C. Access for operation and maintenance must be restricted
D. Access for operation and maintenance must be blocked
Correct Answer: A. Access for operation and maintenance must not
be hazardous
Rationale: A requirement for the access of the boiler is that access
for operation and maintenance must not be hazardous .
Question 4
What is required upon installation to operate a boiler?
A. Inspection and test resulting in equipment use permit from
commissioner
B. No inspection required
C. Only a verbal approval
D. Only a written request
Correct Answer: A. Inspection and test resulting in equipment use
permit from commissioner
Rationale: Upon installation, inspection and test resulting in
,equipment use permit from commissioner is required to operate a
boiler .
Question 5
How often should a boiler be inspected?
A. Once a year
B. Twice a year
C. Every two years
D. Every five years
Correct Answer: A. Once a year
Rationale: A boiler should be inspected once a year .
Question 6
What documentation is required from a certificate holder?
A. Owner's annual statement
B. Owner's monthly statement
C. Owner's weekly statement
D. Owner's daily statement
Correct Answer: A. Owner's annual statement
Rationale: The documentation required from a certificate holder is
the owner's annual statement .
Question 7
What is required to hydrostatically test upon installation and who should
perform these tests?
A. Liquid fuel piping and fuel oil storage tanks by the installing contractor
, B. Gas piping by the building owner
C. Water piping by the building tenant
D. Steam piping by the building manager
Correct Answer: A. Liquid fuel piping and fuel oil storage tanks by
the installing contractor
Rationale: Upon installation, liquid fuel piping and fuel oil storage
tanks must be hydrostatically tested by the installing contractor .
Question 8
At what pressure should piping be tested?
A. 1/2 max working pressure but less than pressure required for storage
tank
B. 1/4 max working pressure
C. 3/4 max working pressure
D. Full max working pressure
Correct Answer: A. 1/2 max working pressure but less than
pressure required for storage tank
Rationale: Piping should be tested at 1/2 max working pressure but
less than pressure required for storage tank .
Question 9
At what pressure should oil storage tanks be tested?
A. At 1 1/2x max working pressure but never < 25 psi
B. At 1x max working pressure
C. At 2x max working pressure
D. At 3x max working pressure
Answers 100% Updated!
SECTION 1: BOILER INSTALLATION & LOCATION REQUIREMENTS
(Questions 1–30)
Question 1
What is a general requirement of the location of the installation of a
boiler?
A. Adequate clearance from combustible construction
B. Inadequate clearance from combustible construction
C. Located in a confined space
D. Located below ground level
Correct Answer: A. Adequate clearance from combustible
construction
Rationale: A general requirement of the location of the installation of
a boiler is adequate clearance from combustible construction .
Question 2
What temperature must the materials remain under during combustion?
A. 170 degrees
B. 100 degrees
C. 200 degrees
D. 300 degrees
,Correct Answer: A. 170 degrees
Rationale: The materials must remain under 170 degrees during
combustion .
Question 3
What is a requirement for the access of the boiler?
A. Access for operation and maintenance must not be hazardous
B. Access for operation and maintenance must be hazardous
C. Access for operation and maintenance must be restricted
D. Access for operation and maintenance must be blocked
Correct Answer: A. Access for operation and maintenance must not
be hazardous
Rationale: A requirement for the access of the boiler is that access
for operation and maintenance must not be hazardous .
Question 4
What is required upon installation to operate a boiler?
A. Inspection and test resulting in equipment use permit from
commissioner
B. No inspection required
C. Only a verbal approval
D. Only a written request
Correct Answer: A. Inspection and test resulting in equipment use
permit from commissioner
Rationale: Upon installation, inspection and test resulting in
,equipment use permit from commissioner is required to operate a
boiler .
Question 5
How often should a boiler be inspected?
A. Once a year
B. Twice a year
C. Every two years
D. Every five years
Correct Answer: A. Once a year
Rationale: A boiler should be inspected once a year .
Question 6
What documentation is required from a certificate holder?
A. Owner's annual statement
B. Owner's monthly statement
C. Owner's weekly statement
D. Owner's daily statement
Correct Answer: A. Owner's annual statement
Rationale: The documentation required from a certificate holder is
the owner's annual statement .
Question 7
What is required to hydrostatically test upon installation and who should
perform these tests?
A. Liquid fuel piping and fuel oil storage tanks by the installing contractor
, B. Gas piping by the building owner
C. Water piping by the building tenant
D. Steam piping by the building manager
Correct Answer: A. Liquid fuel piping and fuel oil storage tanks by
the installing contractor
Rationale: Upon installation, liquid fuel piping and fuel oil storage
tanks must be hydrostatically tested by the installing contractor .
Question 8
At what pressure should piping be tested?
A. 1/2 max working pressure but less than pressure required for storage
tank
B. 1/4 max working pressure
C. 3/4 max working pressure
D. Full max working pressure
Correct Answer: A. 1/2 max working pressure but less than
pressure required for storage tank
Rationale: Piping should be tested at 1/2 max working pressure but
less than pressure required for storage tank .
Question 9
At what pressure should oil storage tanks be tested?
A. At 1 1/2x max working pressure but never < 25 psi
B. At 1x max working pressure
C. At 2x max working pressure
D. At 3x max working pressure